Clock In and Out
Zone Part History Time Tickets Comments Files Zone Part History Time Tickets Comments Files Clock
Select Multiple
Change Options
Overwrite Quantity
Update Comments only
...
Recent Time Tickets
All Open Closed 30323-01

By selecting a zone the data you see will be filtered to show only timetickets and jobs running for that specific zone.




Attach completed CMM report with manual measurements.

StepNo Doc Type Doc Name Upload By Date
undefined Drawing undefined undefined undefined
undefined Bubble undefined undefined undefined
undefined XML undefined undefined undefined
undefined MOD3 undefined undefined undefined
Image

Expediting this order. .

Yia Lee
Wed May 07 2025 20:16:23 GMT+0000 (Coordinated Universal Time)
Image

Reaching out for Expedite option. .

Yia Lee
Wed May 07 2025 17:11:52 GMT+0000 (Coordinated Universal Time)
Image

Reach out for EC dates..

Yia Lee
Wed May 07 2025 13:24:31 GMT+0000 (Coordinated Universal Time)
Image

Reach out for EC dates on. .

Yia Lee
Wed May 07 2025 13:24:14 GMT+0000 (Coordinated Universal Time)
Image

Switching this to NDE Labs in Texas for USI. Waiting for Jake to approve new vendor onboarding form. .

Yia Lee
Thu May 01 2025 15:49:00 GMT+0000 (Coordinated Universal Time)
Image

Mistras Cali can't expedite this order due to their backlog. it's going to take 12-14 days to C-Scan plus transit until we received this material. .

Yia Lee
Wed Apr 30 2025 16:00:54 GMT+0000 (Coordinated Universal Time)
Image

Talked during huddle on 4/28 that this job is a month behind schedule (accelerated) and we are still projecting to be late. Not an option to bring in house. Dave and Gregg to work with customer/share info on being late. .

Jake Gardner
Mon Apr 28 2025 17:27:30 GMT+0000 (Coordinated Universal Time)
Image

UPS Tracking# 1Z9238320366254369.

Yia Lee
Mon Apr 28 2025 16:02:17 GMT+0000 (Coordinated Universal Time)
Image

Machine: Not Required <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Material: HFM <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Hardware: NA <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Mod: Closed <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Since Planned: 0 days Since Last Moved: 0 days .

System Generated Plan Status
Fri Apr 25 2025 21:28:03 GMT+0000 (Coordinated Universal Time)
Image

Received a quote from No Limit Swiss. $12 ea less EDM feature, 4 week lead time. Would prefer 9/16" material as 3/4" would require a lot of material removal..

Derek Bodine
Fri Apr 25 2025 17:14:49 GMT+0000 (Coordinated Universal Time)
Image

Derek is looking for bids at swiss shops..

Robert Perry
Thu Apr 24 2025 22:06:11 GMT+0000 (Coordinated Universal Time)
Image

Robert reviewing.

Dustin Laberta
Mon Apr 21 2025 23:39:16 GMT+0000 (Coordinated Universal Time)
Image

Dims verified. .

Zack Johnson
Wed Apr 16 2025 19:24:37 GMT+0000 (Coordinated Universal Time)
Image

New EC: 04/16 (by Zack Johnson on 04/16/25 09:36 AM) Assigned to Zack Johnson, EC Date: 04/15.

Zack Johnson
Mon Apr 14 2025 17:30:35 GMT+0000 (Coordinated Universal Time)
Image

DIM CHECK.

Emily Marshall
Mon Apr 14 2025 13:19:37 GMT+0000 (Coordinated Universal Time)
Image

Assigned to Ben Lo, EC Date: 04/11.

Ben Lo
Fri Apr 11 2025 16:55:53 GMT+0000 (Coordinated Universal Time)
Image

Quoted lead-time 10 weeks - delivery 6/20.

Dave Barr
Fri Apr 11 2025 16:03:54 GMT+0000 (Coordinated Universal Time)
Image

<b>Material lead time in M days:</b> 15 <b>Needed Material Dock Date:</b> 05/05/2025 <b>Material Risks: </b> Expedite order -- need material within 15 days <b>Expected Outside Processing in M days: </b>10 <b>Finishing Risks: </b>None <b>Part Complexity: </b> 5 - Medium <b>Operational Risks: </b> None.

Gregg Marshall
Thu Apr 10 2025 07:00:00 GMT+0000 (Coordinated Universal Time)

Part History is currently not available. Check back soon!

Clocking In & Out

Q: Do I have to enter a step number?

A: Yes, if you are clocking in or out of a job you must enter a step number.

Q: How do I know the current step number?

A: Find the work order OR enter a job number and review time tickets. It should be clear what step number is current. For Workcenters not associated with the planning, i.e. New Orders, MFG Other, etc. A triple ZERO option should populate.

Q: Can I clock into two different step numbers at the same time?

A: Yes. If you are running two different operations at the same time you can click on the "select multiple" badge and then select additional operations. There is no limit.

Q: What if I need to move a job to a workcenter not available in the drop down?

A: Submit a planning change. The work order should reflect each step needed.

Q: BUT wait... The work order has a generic workcenter(i.e. INSPECT) and I need to move the job to the CMM-HEXLG1 queue.

A: Get a manger or lead to sign off on the change. **For inspection move to planned workcenter and inspector will be prompted to enter Machine.

CNC Programming

Q: How do I clock in & out for a re-post?

Option A: Click on the purple report link when prompted. Enter job number and step number. Clock in.
Option B: Go to zones --> Re-Post. Enter job number and step number. Clock in.

Clocking Out:You can not clock out without reporting a quantity. Enter last reported quantity when alerted. To force the alert enter a quantity of 1 or greater OR click "Clock out".