Clock In and Out
Zone Part History Time Tickets Comments Files Zone Part History Time Tickets Comments Files Clock
140 130
Change Options
Overwrite Quantity
Update Comments only
...
Recent Time Tickets
All Open Closed 30352-02

By selecting a zone the data you see will be filtered to show only timetickets and jobs running for that specific zone.




Attach completed CMM report with manual measurements.

StepNo Doc Type Doc Name Upload By Date
undefined Drawing undefined undefined undefined
undefined Bubble undefined undefined undefined
undefined XML undefined undefined undefined
undefined MOD3 undefined undefined undefined
undefined Other undefined undefined undefined
Image

BLUE STREAK PO: 64235.

Kathleen Chang
Mon May 12 2025 20:00:43 GMT+0000 (Coordinated Universal Time)
Image

Mapsco 5/12.

Victor Da Silva
Mon May 12 2025 19:18:54 GMT+0000 (Coordinated Universal Time)
Image

parts on outplant table 5/12.

Andy Lor
Mon May 12 2025 17:55:28 GMT+0000 (Coordinated Universal Time)
Image

Assigned to Andy Lor, EC Date: 05/12.

Shane Warnock
Mon May 12 2025 16:47:12 GMT+0000 (Coordinated Universal Time)
Image

Received. In shipping.

Kathleen Chang
Mon May 12 2025 16:42:34 GMT+0000 (Coordinated Universal Time)
Image

PYROTEK PO: 64069.

Kathleen Chang
Mon May 05 2025 13:06:29 GMT+0000 (Coordinated Universal Time)
Image

Touching up bend lines. EC-5/2 QTY 4 15min a part.

Jason Newlun
Fri May 02 2025 20:22:00 GMT+0000 (Coordinated Universal Time)
Image

New EC: Invalid date (by Victor Da Silva on 05/12/25 12:04 PM) New EC: Invalid date (by Victor Da Silva on 05/05/25 08:10 AM) Assigned to , EC Date: Invalid date.

Victor Da Silva
Fri May 02 2025 19:05:57 GMT+0000 (Coordinated Universal Time)
Image

Pyrotek 5/2.

Victor Da Silva
Fri May 02 2025 18:58:41 GMT+0000 (Coordinated Universal Time)
Image

on fab QA table.

Phil So
Fri May 02 2025 16:17:06 GMT+0000 (Coordinated Universal Time)
Image

on fab QA table.

Phil So
Fri May 02 2025 16:17:06 GMT+0000 (Coordinated Universal Time)
Image

Assigned to Dan McDowell, EC Date: 05/02.

Emily Marshall
Fri May 02 2025 13:03:53 GMT+0000 (Coordinated Universal Time)
Image

2hr Setup/6min run time.

Emily Marshall
Fri May 02 2025 12:34:33 GMT+0000 (Coordinated Universal Time)
Image

null.

Lor Xiong
Fri May 02 2025 00:42:09 GMT+0000 (Coordinated Universal Time)
Image

null.

Nathan James
Wed Apr 30 2025 19:30:40 GMT+0000 (Coordinated Universal Time)
Image

move to material stage .

Charlie Vang
Tue Apr 29 2025 16:41:09 GMT+0000 (Coordinated Universal Time)
Image

Parts are in Fab QA ready to be issued to the machine shop-4/29.

Jason Newlun
Tue Apr 29 2025 15:35:12 GMT+0000 (Coordinated Universal Time)
Image

New EC: 04/29 (by Emily Marshall on 04/29/25 05:50 AM) Assigned to Lou Lor, EC Date: 04/28.

Emily Marshall
Mon Apr 28 2025 16:50:44 GMT+0000 (Coordinated Universal Time)
Image

Removing material to achieve a thickness of .112-.122. EC-4/28 .

Jason Newlun
Mon Apr 28 2025 14:45:59 GMT+0000 (Coordinated Universal Time)
Image

Assigned to Dan McDowell, EC Date: 04/28.

Emily Marshall
Fri Apr 25 2025 21:33:51 GMT+0000 (Coordinated Universal Time)
Image

Machine: Ready <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Material: Closed <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Hardware: NA <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Mod: Closed <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Since Planned: 0 days Since Last Moved: 0 days .

System Generated Plan Status
Fri Apr 25 2025 18:36:25 GMT+0000 (Coordinated Universal Time)
Image

Material sized PO 61144 Material 7075-O .125 THK BARE Job number 30352-02 (5 pcs), Sheet size 22 X 113 Remaining rem 22 x 27 Location 6-B.

Randy Ho
Fri Apr 25 2025 13:12:36 GMT+0000 (Coordinated Universal Time)
Image

Waiting for programming for blank size and top plate size .

Randy Ho
Thu Apr 24 2025 15:36:19 GMT+0000 (Coordinated Universal Time)
Image

In Programming. Aaron #1. EC today 4/24..

Dustin Laberta
Thu Apr 24 2025 14:08:46 GMT+0000 (Coordinated Universal Time)
Image

SHOP AID AND MODEL VERIFIED.

Josh Todd
Wed Apr 23 2025 22:11:04 GMT+0000 (Coordinated Universal Time)
Image

Assigned to Josh Todd, EC Date: 04/24.

Zack Johnson
Wed Apr 23 2025 21:33:17 GMT+0000 (Coordinated Universal Time)
Image

Modified model and shop aid drawing created, dims verified. HF review. .

Zack Johnson
Wed Apr 23 2025 14:48:53 GMT+0000 (Coordinated Universal Time)
Image

Assigned to Zack Johnson, EC Date: 04/23.

Zack Johnson
Wed Apr 23 2025 13:41:07 GMT+0000 (Coordinated Universal Time)
Image

DIM CHECK.

Emily Marshall
Wed Apr 23 2025 00:12:13 GMT+0000 (Coordinated Universal Time)
Image

Email sent to Dave and Gregg @510pm 4/22 advising we are running a high risk of being late to the customer. Material to be issued to floor on 3/5.

Emily Marshall
Wed Apr 23 2025 00:12:05 GMT+0000 (Coordinated Universal Time)
Image

Assigned to Emily Marshall, EC Date: 04/22.

Emily Marshall
Tue Apr 22 2025 15:59:54 GMT+0000 (Coordinated Universal Time)
Image

New EC: 04/21 (by Emily Marshall on 04/21/25 10:01 AM) Assigned to Ben Lo, EC Date: 04/18.

Ben Lo
Fri Apr 18 2025 16:43:41 GMT+0000 (Coordinated Universal Time)
Image

Quoted lead-time 6-8 weeks (5/31-6/14).

Dave Barr
Fri Apr 18 2025 14:48:40 GMT+0000 (Coordinated Universal Time)
Image

<b>Material lead time in M days:</b> 7 <b>Needed Material Dock Date:</b> 04/25/2025 <b>Material Risks: </b> None <b>Expected Outside Processing in M days: </b>14 <b>Finishing Risks: </b>None <b>Part Complexity: </b> 2 - Basic <b>Operational Risks: </b> None.

Dave Barr
Tue Apr 15 2025 07:00:00 GMT+0000 (Coordinated Universal Time)

Part History is currently not available. Check back soon!

Clocking In & Out

Q: Do I have to enter a step number?

A: Yes, if you are clocking in or out of a job you must enter a step number.

Q: How do I know the current step number?

A: Find the work order OR enter a job number and review time tickets. It should be clear what step number is current. For Workcenters not associated with the planning, i.e. New Orders, MFG Other, etc. A triple ZERO option should populate.

Q: Can I clock into two different step numbers at the same time?

A: Yes. If you are running two different operations at the same time you can click on the "select multiple" badge and then select additional operations. There is no limit.

Q: What if I need to move a job to a workcenter not available in the drop down?

A: Submit a planning change. The work order should reflect each step needed.

Q: BUT wait... The work order has a generic workcenter(i.e. INSPECT) and I need to move the job to the CMM-HEXLG1 queue.

A: Get a manger or lead to sign off on the change. **For inspection move to planned workcenter and inspector will be prompted to enter Machine.

CNC Programming

Q: How do I clock in & out for a re-post?

Option A: Click on the purple report link when prompted. Enter job number and step number. Clock in.
Option B: Go to zones --> Re-Post. Enter job number and step number. Clock in.

Clocking Out:You can not clock out without reporting a quantity. Enter last reported quantity when alerted. To force the alert enter a quantity of 1 or greater OR click "Clock out".