Clock In and Out
Zone Part History Time Tickets Comments Files Zone Part History Time Tickets Comments Files Clock
110 120 130
Change Options
Overwrite Quantity
Update Comments only
...
Recent Time Tickets
All Open Closed 30177-01

By selecting a zone the data you see will be filtered to show only timetickets and jobs running for that specific zone.




Attach completed CMM report with manual measurements.

StepNo Doc Type Doc Name Upload By Date
undefined Drawing undefined undefined undefined
undefined Bubble undefined undefined undefined
undefined Other undefined undefined undefined
undefined XML undefined undefined undefined
undefined MOD3 undefined undefined undefined
Image

Op-1 is done i op-2 running and half way through op-2 is done but the part loaded wrong the part comes out bad . we have only checked the very first part it off by 0.058'' we had add positive 0.058 on y offset running the stiching operation to get good parts..

Ryan Boyd
Mon May 12 2025 20:03:37 GMT+0000 (Coordinated Universal Time)
Image

Op-1 is done i op-2 running and half way through op-2 is done but the part loaded wrong the part comes out bad . we have only checked the very first part it off by 0.058'' we had add positive 0.058 on y offset running the stiching operation to get good parts..

Nuredin Ahmed
Fri May 09 2025 21:18:28 GMT+0000 (Coordinated Universal Time)
Image

Op-1 is done i op-2 running and half way through.

Nuredin Ahmed
Thu May 08 2025 23:57:41 GMT+0000 (Coordinated Universal Time)
Image

Op-1 is done it is ready for Op-2.

Nuredin Ahmed
Thu May 08 2025 00:21:54 GMT+0000 (Coordinated Universal Time)
Image

Machine: Up Next Material: Closed <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Hardware: NA <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Mod: Closed <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Since Planned: 0 days Since Last Moved: 8 days .

System Generated Plan Status
Wed Apr 23 2025 19:30:58 GMT+0000 (Coordinated Universal Time)
Image

move to material stage .

Charlie Vang
Wed Apr 23 2025 19:29:28 GMT+0000 (Coordinated Universal Time)
Image

New EC: 04/24 (by Emily Marshall on 04/22/25 10:56 AM) New EC: 04/22 (by Emily Marshall on 04/22/25 10:56 AM) Assigned to Randy Ho, EC Date: 04/21.

Randy Ho
Fri Apr 18 2025 16:46:38 GMT+0000 (Coordinated Universal Time)
Image

In Programming.

Dustin Laberta
Wed Mar 26 2025 13:41:04 GMT+0000 (Coordinated Universal Time)
Image

Shop aid drawing created, dims verified. HF review. .

Zack Johnson
Tue Mar 25 2025 16:00:03 GMT+0000 (Coordinated Universal Time)
Image

Assigned to Zack Johnson, EC Date: 03/25.

Emily Marshall
Mon Mar 24 2025 17:11:41 GMT+0000 (Coordinated Universal Time)
Image

Dim Check.

undefined
Mon Mar 24 2025 16:10:00 GMT+0000 (Coordinated Universal Time)
Image

Assigned to Ben Lo, EC Date: 03/24.

Ben Lo
Mon Mar 24 2025 15:31:11 GMT+0000 (Coordinated Universal Time)
Image

3/19 - Followed up on PO REV update.

Christine Cross
Wed Mar 19 2025 21:40:25 GMT+0000 (Coordinated Universal Time)
Image

<b>Material lead time in M days:</b> 10 <b>Needed Material Dock Date:</b> 04/02/2025 <b>Material Risks: </b> None <b>Expected Outside Processing in M days: </b>25 <b>Finishing Risks: </b>None <b>Part Complexity: </b> 4 - Moderate <b>Operational Risks: </b> None.

Davis Tucker
Mon Mar 17 2025 07:00:00 GMT+0000 (Coordinated Universal Time)

Part History is currently not available. Check back soon!

Clocking In & Out

Q: Do I have to enter a step number?

A: Yes, if you are clocking in or out of a job you must enter a step number.

Q: How do I know the current step number?

A: Find the work order OR enter a job number and review time tickets. It should be clear what step number is current. For Workcenters not associated with the planning, i.e. New Orders, MFG Other, etc. A triple ZERO option should populate.

Q: Can I clock into two different step numbers at the same time?

A: Yes. If you are running two different operations at the same time you can click on the "select multiple" badge and then select additional operations. There is no limit.

Q: What if I need to move a job to a workcenter not available in the drop down?

A: Submit a planning change. The work order should reflect each step needed.

Q: BUT wait... The work order has a generic workcenter(i.e. INSPECT) and I need to move the job to the CMM-HEXLG1 queue.

A: Get a manger or lead to sign off on the change. **For inspection move to planned workcenter and inspector will be prompted to enter Machine.

CNC Programming

Q: How do I clock in & out for a re-post?

Option A: Click on the purple report link when prompted. Enter job number and step number. Clock in.
Option B: Go to zones --> Re-Post. Enter job number and step number. Clock in.

Clocking Out:You can not clock out without reporting a quantity. Enter last reported quantity when alerted. To force the alert enter a quantity of 1 or greater OR click "Clock out".