Clock In and Out
Zone Part History Time Tickets Comments Files Zone Part History Time Tickets Comments Files Clock
Select Multiple
Change Options
Overwrite Quantity
Update Comments only
...
Recent Time Tickets
FPBO Queue All Open Closed 28129-75
You are only viewing data for this zone.
HAAS17 HAAS11 HAAS23 SHOP DEBURR

By selecting a zone the data you see will be filtered to show only timetickets and jobs running for that specific zone.




Attach completed CMM report with manual measurements.

StepNo Doc Type Doc Name Upload By Date
undefined Drawing undefined undefined undefined
undefined Parts List undefined undefined undefined
undefined Bubble undefined undefined undefined
undefined XML undefined undefined undefined
undefined MOD3 undefined undefined undefined
undefined Child Drawing undefined undefined undefined
undefined Other undefined undefined undefined
Image

null.

Ryan Taylor
Mon May 12 2025 01:03:19 GMT+0000 (Coordinated Universal Time)
Image

Need work order split for quantity 12. .

Jake Gardner
Thu May 08 2025 22:12:33 GMT+0000 (Coordinated Universal Time)
Image

Machine: Tool Check Material: NA <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Hardware: NA <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Mod: Closed <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Since Planned: 0 days Since Last Moved: 0 days .

System Generated Plan Status
Tue Apr 22 2025 13:21:44 GMT+0000 (Coordinated Universal Time)
Image

Rob working with Derek Ozzie to get Mill Op Programmed. Will be completed today. (split order from 28129-17).

Emily Marshall
Thu Apr 17 2025 16:02:08 GMT+0000 (Coordinated Universal Time)

Part History is currently not available. Check back soon!

Clocking In & Out

Q: Do I have to enter a step number?

A: Yes, if you are clocking in or out of a job you must enter a step number.

Q: How do I know the current step number?

A: Find the work order OR enter a job number and review time tickets. It should be clear what step number is current. For Workcenters not associated with the planning, i.e. New Orders, MFG Other, etc. A triple ZERO option should populate.

Q: Can I clock into two different step numbers at the same time?

A: Yes. If you are running two different operations at the same time you can click on the "select multiple" badge and then select additional operations. There is no limit.

Q: What if I need to move a job to a workcenter not available in the drop down?

A: Submit a planning change. The work order should reflect each step needed.

Q: BUT wait... The work order has a generic workcenter(i.e. INSPECT) and I need to move the job to the CMM-HEXLG1 queue.

A: Get a manger or lead to sign off on the change. **For inspection move to planned workcenter and inspector will be prompted to enter Machine.

CNC Programming

Q: How do I clock in & out for a re-post?

Option A: Click on the purple report link when prompted. Enter job number and step number. Clock in.
Option B: Go to zones --> Re-Post. Enter job number and step number. Clock in.

Clocking Out:You can not clock out without reporting a quantity. Enter last reported quantity when alerted. To force the alert enter a quantity of 1 or greater OR click "Clock out".