Clock In and Out
Zone Part History Time Tickets Comments Files Zone Part History Time Tickets Comments Files Clock
150 140 130 120 110
Change Options
Overwrite Quantity
Update Comments only
...
Recent Time Tickets
FPBO Queue All Open Closed 30270-04
You are only viewing data for this zone.
HARDINGE HAAS10 HAAS2

By selecting a zone the data you see will be filtered to show only timetickets and jobs running for that specific zone.




Attach completed CMM report with manual measurements.

StepNo Doc Type Doc Name Upload By Date
undefined Drawing undefined undefined undefined
undefined Bubble undefined undefined undefined
undefined XML undefined undefined undefined
undefined MOD3 undefined undefined undefined
Image

null.

Jeffrey Poe
Tue May 13 2025 11:56:29 GMT+0000 (Coordinated Universal Time)
Image

null.

Touchee Vue
Tue May 13 2025 09:41:21 GMT+0000 (Coordinated Universal Time)
Image

null.

Touchee Vue
Tue May 13 2025 06:37:18 GMT+0000 (Coordinated Universal Time)
Image

move to material stage .

Charlie Vang
Fri May 02 2025 17:24:23 GMT+0000 (Coordinated Universal Time)
Image

w.o in material office.

Ben Lo
Fri May 02 2025 17:00:34 GMT+0000 (Coordinated Universal Time)
Image

Machine: Ready <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Material: Closed <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Hardware: HFM <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Mod: Closed <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Since Planned: 0 days Since Last Moved: 0 days .

System Generated Plan Status
Fri May 02 2025 16:56:58 GMT+0000 (Coordinated Universal Time)
Image

Assigned to Ben Lo, EC Date: 05/02.

Ben Lo
Fri May 02 2025 16:33:06 GMT+0000 (Coordinated Universal Time)
Image

Chem Issue Resolved - Continue Planning Part.

Davis Tucker
Fri May 02 2025 16:26:17 GMT+0000 (Coordinated Universal Time)
Image

Assigned to Davis Tucker, EC Date: 04/29.

Ben Lo
Tue Apr 29 2025 13:17:18 GMT+0000 (Coordinated Universal Time)
Image

Hold4 clarification from customer on chem specs. Two different chem specs called out on detail and assy. Reached out to Davis to confirm which spec to use. The spec on the detail part is for clear chem and the assy dwg calls out for the gold/yellow chem..

undefined
Mon Apr 28 2025 21:00:13 GMT+0000 (Coordinated Universal Time)
Image

In review.

Ben Lo
Mon Apr 28 2025 18:44:03 GMT+0000 (Coordinated Universal Time)
Image

Assigned to Ben Lo, EC Date: 04/28.

Ben Lo
Mon Apr 28 2025 16:36:25 GMT+0000 (Coordinated Universal Time)
Image

In Programming.

Dustin Laberta
Wed Apr 09 2025 13:38:25 GMT+0000 (Coordinated Universal Time)
Image

Dims verified. .

Zack Johnson
Mon Apr 07 2025 21:29:35 GMT+0000 (Coordinated Universal Time)
Image

Assigned to Zack Johnson, EC Date: 04/07.

Zack Johnson
Mon Apr 07 2025 16:18:02 GMT+0000 (Coordinated Universal Time)
Image

Dim Check.

undefined
Fri Apr 04 2025 17:54:10 GMT+0000 (Coordinated Universal Time)
Image

Assigned to Ben Lo, EC Date: 04/04.

Ben Lo
Fri Apr 04 2025 16:30:07 GMT+0000 (Coordinated Universal Time)
Image

New BOM added from part history.

Ben Lo
Fri Apr 04 2025 12:51:55 GMT+0000 (Coordinated Universal Time)

Part History is currently not available. Check back soon!

Clocking In & Out

Q: Do I have to enter a step number?

A: Yes, if you are clocking in or out of a job you must enter a step number.

Q: How do I know the current step number?

A: Find the work order OR enter a job number and review time tickets. It should be clear what step number is current. For Workcenters not associated with the planning, i.e. New Orders, MFG Other, etc. A triple ZERO option should populate.

Q: Can I clock into two different step numbers at the same time?

A: Yes. If you are running two different operations at the same time you can click on the "select multiple" badge and then select additional operations. There is no limit.

Q: What if I need to move a job to a workcenter not available in the drop down?

A: Submit a planning change. The work order should reflect each step needed.

Q: BUT wait... The work order has a generic workcenter(i.e. INSPECT) and I need to move the job to the CMM-HEXLG1 queue.

A: Get a manger or lead to sign off on the change. **For inspection move to planned workcenter and inspector will be prompted to enter Machine.

CNC Programming

Q: How do I clock in & out for a re-post?

Option A: Click on the purple report link when prompted. Enter job number and step number. Clock in.
Option B: Go to zones --> Re-Post. Enter job number and step number. Clock in.

Clocking Out:You can not clock out without reporting a quantity. Enter last reported quantity when alerted. To force the alert enter a quantity of 1 or greater OR click "Clock out".