Clock In and Out
Zone Part History Time Tickets Comments Files Zone Part History Time Tickets Comments Files Clock
Select Multiple
Change Options
Overwrite Quantity
Update Comments only
...
Recent Time Tickets
All Open Closed 30298-04

By selecting a zone the data you see will be filtered to show only timetickets and jobs running for that specific zone.




Attach completed CMM report with manual measurements.

StepNo Doc Type Doc Name Upload By Date
undefined Drawing undefined undefined undefined
undefined Bubble undefined undefined undefined
undefined XML undefined undefined undefined
undefined MOD3 undefined undefined undefined
undefined Other undefined undefined undefined
Image

FAI Completed 5/13.

Kristy Walton
Tue May 13 2025 21:13:49 GMT+0000 (Coordinated Universal Time)
Image

BA to review 5/13.

Kristy Walton
Tue May 13 2025 20:36:12 GMT+0000 (Coordinated Universal Time)
Image

HF Dims 5/13.

Kristy Walton
Tue May 13 2025 20:17:54 GMT+0000 (Coordinated Universal Time)
Image

Assigned to Kristy Walton, EC Date: 05/13.

Kristy Walton
Tue May 13 2025 17:25:07 GMT+0000 (Coordinated Universal Time)
Image

4 parts good for FAI - P/M discrepancy has been resolved, PO (drawing) supersedes cust email.

Alex Limtiaco
Mon May 12 2025 18:03:01 GMT+0000 (Coordinated Universal Time)
Image

Per T&C's, PO takes precedence over email communication. PO was not updated to reflect email conversations. Can ship if the parts meet print. .

Tyler Deis
Mon May 12 2025 17:56:00 GMT+0000 (Coordinated Universal Time)
Image

Re-Inspected parts; Corrected MOD3; Moved parts back to MRB; QI 5/7.

Shane Warnock
Mon May 12 2025 17:03:36 GMT+0000 (Coordinated Universal Time)
Image

Assigned to Quayson Ignacio, EC Date: 05/09.

Shane Warnock
Thu May 08 2025 15:22:24 GMT+0000 (Coordinated Universal Time)
Image

Re-Inspected parts; Corrected MOD3; Moved parts back to MRB; QI 5/7.

Quayson Ignacio
Thu May 08 2025 12:42:17 GMT+0000 (Coordinated Universal Time)
Image

Re-inspecting; Parts back of shipping; QI 5/7.

Quayson Ignacio
Wed May 07 2025 21:39:50 GMT+0000 (Coordinated Universal Time)
Image

Re-inspecting; Parts back of shipping; QI 5/7.

Quayson Ignacio
Wed May 07 2025 21:00:50 GMT+0000 (Coordinated Universal Time)
Image

4 parts need to be reinspected- walked Quason thru best practices.

Alex Limtiaco
Mon May 05 2025 20:12:28 GMT+0000 (Coordinated Universal Time)
Image

Assigned to Alex Limtiaco, EC Date: 05/05.

Alex Limtiaco
Mon May 05 2025 16:57:48 GMT+0000 (Coordinated Universal Time)
Image

Will investigate OOT condition and cause for use of JEMCO drawing.

Alex Limtiaco
Mon May 05 2025 16:41:24 GMT+0000 (Coordinated Universal Time)
Image

NCR #28228; Bubbles 4, 13, 15, 17, 18, 19 and 20 OOT.

Phil So
Mon May 05 2025 16:03:41 GMT+0000 (Coordinated Universal Time)
Image

NCR #28228; Bubbles 4, 13, 15, 17, 18, 19 and 20 OOT; moved parts to MRB; QI 5/2.

Quayson Ignacio
Fri May 02 2025 20:46:32 GMT+0000 (Coordinated Universal Time)
Image

Assigned to Quayson Ignacio, EC Date: 05/02.

Phil So
Fri May 02 2025 14:03:13 GMT+0000 (Coordinated Universal Time)
Image

on the end of QA table .

Lauren Bodine
Thu May 01 2025 18:52:27 GMT+0000 (Coordinated Universal Time)
Image

Located on cart in Receiving.

Derek Bodine
Thu May 01 2025 17:53:04 GMT+0000 (Coordinated Universal Time)
Image

Ready for pick up.

Derek Bodine
Wed Apr 30 2025 17:46:32 GMT+0000 (Coordinated Universal Time)
Image

Machine: Not Required <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Material: Closed <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Hardware: NA <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Mod: Closed <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Since Planned: 0 days Since Last Moved: 0 days .

System Generated Plan Status
Tue Apr 22 2025 14:42:43 GMT+0000 (Coordinated Universal Time)
Image

Material in stock..

Derek Bodine
Mon Apr 21 2025 17:18:52 GMT+0000 (Coordinated Universal Time)
Image

Teams messaged Derek to place PO after getting material size from offload shop..

Jason Koger
Thu Apr 17 2025 15:56:55 GMT+0000 (Coordinated Universal Time)
Image

NEED MOD3 UPDATE FOR C/B DIMENSION CHANGE ON PRINT. SHOP AID AND MODEL VERIFIED.

Josh Todd
Tue Apr 15 2025 20:17:49 GMT+0000 (Coordinated Universal Time)
Image

Assigned to Josh Todd, EC Date: 04/15.

Zack Johnson
Tue Apr 15 2025 15:59:44 GMT+0000 (Coordinated Universal Time)
Image

Per customer email, model CB depth is correct, disregard dwg dim. Modified model and shop aid drawing created, dims verified. HF review. .

Zack Johnson
Tue Apr 15 2025 15:58:50 GMT+0000 (Coordinated Universal Time)
Image

HF clarification on model/print discrepancy (Zone C7, CB depth is 1.325 per dwg, .675 per model).

Zack Johnson
Mon Apr 14 2025 16:08:04 GMT+0000 (Coordinated Universal Time)
Image

Assigned to Zack Johnson, EC Date: 04/14.

Emily Marshall
Fri Apr 11 2025 14:09:01 GMT+0000 (Coordinated Universal Time)
Image

Dim Check.

undefined
Thu Apr 10 2025 18:17:08 GMT+0000 (Coordinated Universal Time)
Image

Assigned to Ben Lo, EC Date: 04/10.

Ben Lo
Thu Apr 10 2025 16:40:13 GMT+0000 (Coordinated Universal Time)
Image

<b>Material lead time in M days:</b> 5 <b>Needed Material Dock Date:</b> 04/18/2025 <b>Material Risks: </b> None <b>Expected Outside Processing in M days: </b> <b>Finishing Risks: </b>None <b>Part Complexity: </b> <b>Operational Risks: </b> None.

Tyler Deis
Mon Apr 07 2025 07:00:00 GMT+0000 (Coordinated Universal Time)

Part History is currently not available. Check back soon!

Clocking In & Out

Q: Do I have to enter a step number?

A: Yes, if you are clocking in or out of a job you must enter a step number.

Q: How do I know the current step number?

A: Find the work order OR enter a job number and review time tickets. It should be clear what step number is current. For Workcenters not associated with the planning, i.e. New Orders, MFG Other, etc. A triple ZERO option should populate.

Q: Can I clock into two different step numbers at the same time?

A: Yes. If you are running two different operations at the same time you can click on the "select multiple" badge and then select additional operations. There is no limit.

Q: What if I need to move a job to a workcenter not available in the drop down?

A: Submit a planning change. The work order should reflect each step needed.

Q: BUT wait... The work order has a generic workcenter(i.e. INSPECT) and I need to move the job to the CMM-HEXLG1 queue.

A: Get a manger or lead to sign off on the change. **For inspection move to planned workcenter and inspector will be prompted to enter Machine.

CNC Programming

Q: How do I clock in & out for a re-post?

Option A: Click on the purple report link when prompted. Enter job number and step number. Clock in.
Option B: Go to zones --> Re-Post. Enter job number and step number. Clock in.

Clocking Out:You can not clock out without reporting a quantity. Enter last reported quantity when alerted. To force the alert enter a quantity of 1 or greater OR click "Clock out".