120: CRAFTMANSHIP DEBURR
Accepted: 0- Rej: 0
Thu May 29 2025 18:45:00 GMT+0000 (Coordinated Universal Time)
Lou Lor
30174-01
122300-002
Wed May 14 2025 19:33:27 GMT+0000 (Coordinated Universal Time)
Closed -
0: PLAN PLAN
Accepted: 0- Rej: 0
Thu May 15 2025 17:34:42 GMT+0000 (Coordinated Universal Time)
Ben Lo
30410-13
418-201-5000-532
Open -
220: FAI PAPERWORK
Accepted: 0- Rej: 0
Thu May 15 2025 17:34:10 GMT+0000 (Coordinated Universal Time)
Cris Midrigan
29907-02
149549-021
Thu May 15 2025 17:34:00 GMT+0000 (Coordinated Universal Time)
Closed -
170: OUTPLANT HEAT TREAT
Accepted: 0- Rej: 0
Thu May 15 2025 17:33:11 GMT+0000 (Coordinated Universal Time)
Kathleen Chang
30293-02
251W4456-20
Thu May 15 2025 17:33:00 GMT+0000 (Coordinated Universal Time)
Closed -
170: OUTPLANT HEAT TREAT
Accepted: 0- Rej: 0
Thu May 15 2025 17:33:05 GMT+0000 (Coordinated Universal Time)
Kathleen Chang
30293-03
251W4456-22
Thu May 15 2025 17:33:00 GMT+0000 (Coordinated Universal Time)
Closed -
170: OUTPLANT CHEM/BLACK ANO
Accepted: 0- Rej: 0
Thu May 15 2025 17:32:59 GMT+0000 (Coordinated Universal Time)
Kathleen Chang
28511-44
00401937-002
Open -
160: OUTPLANT LPI
Accepted: 0- Rej: 0
Thu May 15 2025 17:32:56 GMT+0000 (Coordinated Universal Time)
Kathleen Chang
30221-16
DS4185-729-3017
Thu May 15 2025 17:34:00 GMT+0000 (Coordinated Universal Time)
Closed -
140: OUTPLANT CHEM FILM
Accepted: 0- Rej: 0
Thu May 15 2025 17:32:54 GMT+0000 (Coordinated Universal Time)
Kathleen Chang
30178-02
000-904-2208-005
Thu May 15 2025 17:34:00 GMT+0000 (Coordinated Universal Time)
Closed -
140: OUTPLANT CHEM FILM
Accepted: 0- Rej: 0
Thu May 15 2025 17:32:52 GMT+0000 (Coordinated Universal Time)
Kathleen Chang
30178-08
000-904-2209-005
Open -
160: OUTPLANT HEAT TREAT
Accepted: 0- Rej: 0
Thu May 15 2025 17:32:46 GMT+0000 (Coordinated Universal Time)
Kathleen Chang
30292-03
251W4456-19
Thu May 15 2025 17:34:00 GMT+0000 (Coordinated Universal Time)
Closed -
160: OUTPLANT HEAT TREAT
Accepted: 0- Rej: 0
Thu May 15 2025 17:32:45 GMT+0000 (Coordinated Universal Time)
Kathleen Chang
30292-02
251W4456-21
Thu May 15 2025 17:34:00 GMT+0000 (Coordinated Universal Time)
Closed -
170: FINAL INSP FINAL INSP
Accepted: 0- Rej: 0
Thu May 15 2025 17:32:38 GMT+0000 (Coordinated Universal Time)
Jason Newlun
30350-10
LS-001198
Thu May 15 2025 17:32:00 GMT+0000 (Coordinated Universal Time)
Closed -
190: OUTPLANT CHEM
Accepted: 0- Rej: 0
Thu May 15 2025 17:32:29 GMT+0000 (Coordinated Universal Time)
Kathleen Chang
30349-01
003-169-5693-001
Thu May 15 2025 17:33:00 GMT+0000 (Coordinated Universal Time)
Closed -
200: OUTPLANT LPI/CHEM/ANO
Accepted: 0- Rej: 0
Thu May 15 2025 17:32:04 GMT+0000 (Coordinated Universal Time)
Kathleen Chang
30352-01
002-652-5205-001
Thu May 15 2025 17:32:00 GMT+0000 (Coordinated Universal Time)
Closed -
180: INSPECT PRE-OSP INSP
Accepted: 0- Rej: 0
Thu May 15 2025 17:31:57 GMT+0000 (Coordinated Universal Time)
Jason Newlun
30262-01
1364303-1
Thu May 15 2025 17:31:00 GMT+0000 (Coordinated Universal Time)
Closed -
180: FINAL INSP FINAL INSP
Accepted: 0- Rej: 0
Thu May 15 2025 17:31:28 GMT+0000 (Coordinated Universal Time)
Jason Newlun
30350-11
LS-001903
Thu May 15 2025 17:31:00 GMT+0000 (Coordinated Universal Time)
Closed -
160: FINAL INSP FINAL INSP
Accepted: 0- Rej: 0
Thu May 15 2025 17:31:04 GMT+0000 (Coordinated Universal Time)
Jason Newlun
30236-02
C193505-3231
Thu May 15 2025 17:31:00 GMT+0000 (Coordinated Universal Time)
Closed -
0: ENGINEERING PREP ENGINEERING PREP
Accepted: 0- Rej: 0
Thu May 15 2025 17:30:52 GMT+0000 (Coordinated Universal Time)
Jacob Kraemer
30429-01
TS02467-0715-01
Open -
0: PLAN PLAN
Accepted: 0- Rej: 0
Thu May 15 2025 17:30:44 GMT+0000 (Coordinated Universal Time)
Ben Lo
30410-12
418-201-5000-531
Thu May 15 2025 17:34:00 GMT+0000 (Coordinated Universal Time)
Closed -
200: OUTPLANTL ANODIZE
Accepted: 0- Rej: 0
Thu May 15 2025 17:30:14 GMT+0000 (Coordinated Universal Time)
Jason Newlun
29794-03
C169505-5046
Thu May 15 2025 17:30:00 GMT+0000 (Coordinated Universal Time)
Closed -
0: ENGINEERING PREP ENGINEERING PREP
Accepted: 0- Rej: 0
Thu May 15 2025 17:29:02 GMT+0000 (Coordinated Universal Time)
Zack Johnson
30381-02
C253505-3525
Open -
130: AMADA 50T FORM
Accepted: 0- Rej: 0
Thu May 15 2025 17:27:55 GMT+0000 (Coordinated Universal Time)
Keith Ryland
30411-01
FSS1220-149
Open -
130: FAI PAPERWORK
Accepted: 0- Rej: 0
Thu May 15 2025 17:27:54 GMT+0000 (Coordinated Universal Time)
Kristy Walton
30127-02
003-508-8988-101
Open -
0: PLAN PLAN
Accepted: 0- Rej: 0
Thu May 15 2025 17:27:36 GMT+0000 (Coordinated Universal Time)
Ben Lo
30410-11
418-201-5000-522
Thu May 15 2025 17:30:00 GMT+0000 (Coordinated Universal Time)
Closed -
0: ENGINEERING PREP ENGINEERING PREP
Accepted: 0- Rej: 0
Thu May 15 2025 17:25:42 GMT+0000 (Coordinated Universal Time)
Zack Johnson
30404-04
C253505-3183
Thu May 15 2025 17:27:00 GMT+0000 (Coordinated Universal Time)
Closed -
0: PLAN PLAN
Accepted: 0- Rej: 0
Thu May 15 2025 17:24:15 GMT+0000 (Coordinated Universal Time)
Ben Lo
30410-10
418-201-5000-521
Thu May 15 2025 17:27:00 GMT+0000 (Coordinated Universal Time)
Closed -
Moved to: null
Accepted: 0- Rej: 0
Thu May 15 2025 17:23:53 GMT+0000 (Coordinated Universal Time)
John Lor
30011-01
151587-001
Open -
230: RECEIVING PAINT
Accepted: 0- Rej: 0
Thu May 15 2025 17:22:02 GMT+0000 (Coordinated Universal Time)
Kathleen Chang
29907-03
149549-025
Thu May 15 2025 17:27:00 GMT+0000 (Coordinated Universal Time)
Closed -
0: PLAN PLAN
Accepted: 0- Rej: 0
Thu May 15 2025 17:21:19 GMT+0000 (Coordinated Universal Time)
Ben Lo
30410-09
418-201-5000-512
Thu May 15 2025 17:24:00 GMT+0000 (Coordinated Universal Time)
Closed -
150: PARTMARK PART MARK
Accepted: 0- Rej: 0
Thu May 15 2025 17:18:59 GMT+0000 (Coordinated Universal Time)
Russell Brown
29524-45
148395-001
Open -
230: OUTPLANTL PAINT
Accepted: 0- Rej: 0
Thu May 15 2025 17:16:52 GMT+0000 (Coordinated Universal Time)
Kathleen Chang
29907-03
149549-025
Thu May 15 2025 17:16:00 GMT+0000 (Coordinated Universal Time)
Closed -
100: ASSEMBLE ASSEMBLE
Accepted: 0- Rej: 0
Thu May 15 2025 17:16:38 GMT+0000 (Coordinated Universal Time)
Manuel DeSantiago
30366-01
156847-201
Open -
250: SOURCE PREP PAPERWORK
Accepted: 0- Rej: 0
Thu May 15 2025 17:16:27 GMT+0000 (Coordinated Universal Time)
Cris Midrigan
29648-01
00664902-007
Thu May 15 2025 17:28:00 GMT+0000 (Coordinated Universal Time)
Closed -
140: CRAFTMANSHIP POLISH
Accepted: 0- Rej: 0
Thu May 15 2025 17:14:14 GMT+0000 (Coordinated Universal Time)
Lou Lor
29987-09
C304525-2702
Open -
0: ENGINEERING PREP ENGINEERING PREP
Accepted: 0- Rej: 0
Thu May 15 2025 17:14:04 GMT+0000 (Coordinated Universal Time)
Emily Marshall
30413-01
000-904-4186-001
Thu May 15 2025 17:14:00 GMT+0000 (Coordinated Universal Time)
Closed -
0: PLAN PLAN
Accepted: 0- Rej: 0
Thu May 15 2025 17:13:51 GMT+0000 (Coordinated Universal Time)
Ben Lo
30410-08
418-201-5000-511
Thu May 15 2025 17:20:00 GMT+0000 (Coordinated Universal Time)
Closed -
0: ENGINEERING PREP ENGINEERING PREP
Accepted: 0- Rej: 0
Thu May 15 2025 17:12:28 GMT+0000 (Coordinated Universal Time)
Jacob Kraemer
30322-01
C253505-3521
Thu May 15 2025 17:29:00 GMT+0000 (Coordinated Universal Time)
Closed -
190: FINAL INSP FINAL INSP
Accepted: 0- Rej: 0
Thu May 15 2025 17:12:16 GMT+0000 (Coordinated Universal Time)
Kathleen Chang
30133-03
204-050-3106-001
Thu May 15 2025 17:12:00 GMT+0000 (Coordinated Universal Time)
Closed -
100: ASSEMBLE ASSEMBLE
Accepted: 0- Rej: 0
Thu May 15 2025 17:11:40 GMT+0000 (Coordinated Universal Time)
Landon Jackson
30366-01
156847-201
Open -
230: SHIPPING SHIP
Accepted: 0- Rej: 0
Thu May 15 2025 17:11:04 GMT+0000 (Coordinated Universal Time)
Zamir Haro Dominguez
30331-03
C193505-3342
Open -
0: ENGINEERING PREP ENGINEERING PREP
Accepted: 0- Rej: 0
Thu May 15 2025 17:11:02 GMT+0000 (Coordinated Universal Time)
Jacob Kraemer
30429-01
TS02467-0715-01
Thu May 15 2025 17:12:00 GMT+0000 (Coordinated Universal Time)
Closed -
110: OUTSOURCE MAKE PER DWG
Accepted: 0- Rej: 0
Thu May 15 2025 17:10:36 GMT+0000 (Coordinated Universal Time)
Derek Bodine
30358-01
C304525-2449
Thu May 15 2025 17:10:00 GMT+0000 (Coordinated Universal Time)
Closed -
0: PLAN PLAN
Accepted: 0- Rej: 0
Thu May 15 2025 17:10:19 GMT+0000 (Coordinated Universal Time)
Ben Lo
30410-07
418-201-5000-432
Thu May 15 2025 17:13:00 GMT+0000 (Coordinated Universal Time)
Closed -
140: SHIPPING SHIP
Accepted: 0- Rej: 0
Thu May 15 2025 17:08:45 GMT+0000 (Coordinated Universal Time)
Zamir Haro Dominguez
29538-05
133407-003
Thu May 15 2025 17:08:00 GMT+0000 (Coordinated Universal Time)
Closed -
0: New Orders New Orders
Accepted: 0- Rej: 0
Thu May 15 2025 17:08:16 GMT+0000 (Coordinated Universal Time)
Davis Tucker
29656-10
683-13581-3
Thu May 15 2025 17:08:00 GMT+0000 (Coordinated Universal Time)
Closed -
190: ANY MACHINE SHOP SUPPORT
Accepted: 0- Rej: 0
Thu May 15 2025 17:06:30 GMT+0000 (Coordinated Universal Time)
Bryce Devine
12000-01
General Shop
Open -
150: FINAL INSP FINAL INSP
Accepted: 0- Rej: 0
Thu May 15 2025 17:05:09 GMT+0000 (Coordinated Universal Time)
Quayson Ignacio
29530-06
404-766-9510-001
Open -
0: PLAN PLAN
Accepted: 0- Rej: 0
Thu May 15 2025 17:04:49 GMT+0000 (Coordinated Universal Time)
Ben Lo
30410-06
418-201-5000-431
Thu May 15 2025 17:10:00 GMT+0000 (Coordinated Universal Time)
Closed -
140: MSI LASER MARK
Accepted: 0- Rej: 0
Thu May 15 2025 17:04:12 GMT+0000 (Coordinated Universal Time)
Da Lor
30050-04
150089-001
Open -
210: RECEIVING PAPERWORK
Accepted: 0- Rej: 0
Thu May 15 2025 17:03:46 GMT+0000 (Coordinated Universal Time)
Kathleen Chang
30030-16
149549-025
Thu May 15 2025 17:30:00 GMT+0000 (Coordinated Universal Time)
Closed -
150: CRAFTMANSHIP - GRAIN
Thu May 15 2025 15:54:24 GMT+0000 (Coordinated Universal Time)
Accepted: 0- Rej: 0
Moved to: 170
Jason Newlun
Thu May 15 2025 15:54:00 GMT+0000 (Coordinated Universal Time)
--
-
150: CRAFTMANSHIP - GRAIN
Thu May 15 2025 12:39:12 GMT+0000 (Coordinated Universal Time)
Accepted: 50- Rej: 0
Lou Lor
Thu May 15 2025 15:50:09 GMT+0000 (Coordinated Universal Time)
--
-
150: CRAFTMANSHIP - GRAIN
Wed May 14 2025 11:52:57 GMT+0000 (Coordinated Universal Time)
Accepted: 0- Rej: 0
Lou Lor
Thu May 15 2025 12:38:00 GMT+0000 (Coordinated Universal Time)
--
-
150: CRAFTMANSHIP - GRAIN
Tue May 13 2025 11:47:28 GMT+0000 (Coordinated Universal Time)
Accepted: 0- Rej: 0
Lou Lor
Tue May 13 2025 14:41:40 GMT+0000 (Coordinated Universal Time)
--
-
150: CRAFTMANSHIP - GRAIN
Mon May 12 2025 12:46:23 GMT+0000 (Coordinated Universal Time)
Accepted: 0- Rej: 0
Seng Lor
Mon May 12 2025 14:12:23 GMT+0000 (Coordinated Universal Time)
--
-
150: CRAFTMANSHIP - GRAIN
Fri May 09 2025 20:16:08 GMT+0000 (Coordinated Universal Time)
Accepted: 0- Rej: 0
Seng Lor
Fri May 09 2025 21:01:10 GMT+0000 (Coordinated Universal Time)
--
-
150: CRAFTMANSHIP - GRAIN
Fri May 09 2025 16:13:23 GMT+0000 (Coordinated Universal Time)
Accepted: 0- Rej: 0
Seng Lor
Fri May 09 2025 18:43:13 GMT+0000 (Coordinated Universal Time)
--
-
130: INSPECT - INSPECT
Thu May 08 2025 19:53:28 GMT+0000 (Coordinated Universal Time)
Accepted: 50- Rej: 0
Moved to: CRAFTMANSHIP
Andy Lor
Thu May 08 2025 19:53:28 GMT+0000 (Coordinated Universal Time)
--
-
120: RECEIVING - RECV INSPECT
Thu May 08 2025 18:16:56 GMT+0000 (Coordinated Universal Time)
Accepted: 0- Rej: 0
Moved to: 130
Lauren Bodine
Thu May 08 2025 18:23:00 GMT+0000 (Coordinated Universal Time)
--
-
110: OUTSOURCED - MAKE PER DWG
Thu May 08 2025 18:12:55 GMT+0000 (Coordinated Universal Time)
Accepted: 0- Rej: 0
Moved to: 120
Derek Bodine
Thu May 08 2025 18:13:00 GMT+0000 (Coordinated Universal Time)
--
-
110: OUTSOURCE - MAKE PER DWG
Fri Apr 18 2025 21:05:35 GMT+0000 (Coordinated Universal Time)
Accepted: 0- Rej: 0
Moved to: OUTSOURCED
Derek Bodine
Fri Apr 18 2025 21:05:00 GMT+0000 (Coordinated Universal Time)
--
-
: HFM - None
Wed Apr 09 2025 17:21:12 GMT+0000 (Coordinated Universal Time)
Accepted: 0- Rej: 0
Moved to: OUTSOURCE
Charlie Vang
Wed Apr 09 2025 17:21:12 GMT+0000 (Coordinated Universal Time)
--
-
0: P-RELEASE - P-RELEASE
Tue Apr 01 2025 14:26:28 GMT+0000 (Coordinated Universal Time)
Accepted: 0- Rej: 0
Moved to: HFM
Emily Marshall
Tue Apr 01 2025 14:26:00 GMT+0000 (Coordinated Universal Time)
--
-
0: P-RELEASE - P-RELEASE
Tue Apr 01 2025 13:50:10 GMT+0000 (Coordinated Universal Time)
Accepted: 0- Rej: 0
Moved to: HFM
Randy Ho
Tue Apr 01 2025 07:00:00 GMT+0000 (Coordinated Universal Time)
--
-
0: PRE-PLAN - PRE-PLAN
Sat Mar 29 2025 16:39:42 GMT+0000 (Coordinated Universal Time)
Accepted: 0- Rej: 0
Kristy Walton
Sat Mar 29 2025 16:44:00 GMT+0000 (Coordinated Universal Time)
--
-
: ENGINEERING PREP -
Wed Mar 26 2025 14:26:00 GMT+0000 (Coordinated Universal Time)
Accepted: 0- Rej: 0
Moved to: PRE-PLAN
Josh Todd
Wed Mar 26 2025 14:26:00 GMT+0000 (Coordinated Universal Time)
--
-
0: ENGINEERING PREP - ENGINEERING PREP
Tue Mar 25 2025 16:36:56 GMT+0000 (Coordinated Universal Time)
Accepted: 0- Rej: 0
Zack Johnson
Tue Mar 25 2025 16:49:00 GMT+0000 (Coordinated Universal Time)
--
-
0: PLAN - PLAN
Mon Mar 24 2025 14:40:26 GMT+0000 (Coordinated Universal Time)
Accepted: 0- Rej: 0
Moved to: ENGINEERING PREP
Ben Lo
Mon Mar 24 2025 14:44:00 GMT+0000 (Coordinated Universal Time)
--
-
0: New Orders - New Orders
Fri Mar 21 2025 20:30:11 GMT+0000 (Coordinated Universal Time)
Accepted: 0- Rej: 0
Moved to: PLAN
Christine Cross
Fri Mar 21 2025 20:30:00 GMT+0000 (Coordinated Universal Time)
--
By selecting a zone the data you see will be filtered to show only timetickets and jobs running for that specific zone.
StepNo | Doc Type | Doc Name | Upload By | Date |
undefined | Drawing | undefined | undefined | undefined |
undefined | Other | undefined | undefined | undefined |
undefined | Bubble | undefined | undefined | undefined |
undefined | XML | undefined | undefined | undefined |
undefined | MOD3 | undefined | undefined | undefined |

Assigned to , EC Date: Invalid date.

NOVA PO: 64307.

In shipping-5/15.

9mins per part EC 5/15.

Complex Graining. EC-5/15 Qty 50 20min a part.

New EC: 05/15 (by Emily Marshall on 05/14/25 08:59 AM) New EC: 05/14 (by Emily Marshall on 05/13/25 07:04 AM) New EC: 05/13 (by Emily Marshall on 05/11/25 09:11 AM) New EC: 05/12 (by Emily Marshall on 05/09/25 06:53 AM) Assigned to Jason Newlun, EC Date: 05/09.

parts in craftmanship 5/8.

parts in craftmanship 5/8.

on QA table .

Per RockQuality: Currently running, looking to ship Wednesday AM.

Machine: Not Required <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Material: HFM <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Hardware: NA <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Mod: Closed <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Since Planned: 0 days Since Last Moved: 0 days .

Waiting on Material Purchase.

SHOP AID VERIFIED.

Shop aid drawing created, dims verified. HF review..

Assigned to Zack Johnson, EC Date: 03/25.

Dim Check.

Assigned to Ben Lo, EC Date: 03/24.

<b>Material lead time in M days:</b> 9 <b>Needed Material Dock Date:</b> 04/04/2025 <b>Material Risks: </b> None <b>Expected Outside Processing in M days: </b>15 <b>Finishing Risks: </b>None <b>Part Complexity: </b> 3 - Slightly Complex <b>Operational Risks: </b> None.
Part History is currently not available. Check back soon!
Clocking In & Out
Q: Do I have to enter a step number?
A: Yes, if you are clocking in or out of a job you must enter a step number.
Q: How do I know the current step number?
A: Find the work order OR enter a job number and review time tickets. It should be clear what step number is current. For Workcenters not associated with the planning, i.e. New Orders, MFG Other, etc. A triple ZERO option should populate.
Q: Can I clock into two different step numbers at the same time?
A: Yes. If you are running two different operations at the same time you can click on the "select multiple" badge and then select additional operations. There is no limit.
Q: What if I need to move a job to a workcenter not available in the drop down?
A: Submit a planning change. The work order should reflect each step needed.
Q: BUT wait... The work order has a generic workcenter(i.e. INSPECT) and I need to move the job to the CMM-HEXLG1 queue.
A: Get a manger or lead to sign off on the change. **For inspection move to planned workcenter and inspector will be prompted to enter Machine.
CNC Programming
Q: How do I clock in & out for a re-post?
Option A: Click on the purple report link when prompted. Enter job number and step number. Clock in.
Option B: Go to zones --> Re-Post. Enter job number and step number. Clock in.
Clocking Out:You can not clock out without reporting a quantity. Enter last reported quantity when alerted. To force the alert enter a quantity of 1 or greater OR click "Clock out".