All Open Closed 30178-08

By selecting a zone the data you see will be filtered to show only timetickets and jobs running for that specific zone.




Attach completed CMM report with manual measurements.

StepNo Doc Type Doc Name Upload By Date
undefined Drawing undefined undefined undefined
undefined XML undefined undefined undefined
undefined MOD3 undefined undefined undefined
undefined Bubble undefined undefined undefined
Image

Assigned to , EC Date: Invalid date.

Victor Da Silva
Thu May 15 2025 15:21:12 GMT+0000 (Coordinated Universal Time)
Image

MAPSCO PO: 64298.

Kathleen Chang
Thu May 15 2025 14:36:03 GMT+0000 (Coordinated Universal Time)
Image

- Moved 90/90 to outplant..

Bruce Chang
Thu May 15 2025 13:18:16 GMT+0000 (Coordinated Universal Time)
Image

Assigned to Bruce Chang, EC Date: 05/15.

Shane Warnock
Mon May 12 2025 17:02:22 GMT+0000 (Coordinated Universal Time)
Image

null.

Ethan Vega
Sat May 10 2025 19:13:27 GMT+0000 (Coordinated Universal Time)
Image

New EC: 05/13 (by Emily Marshall on 05/09/25 02:29 PM) Assigned to Jason Newlun, EC Date: 05/12.

Emily Marshall
Fri May 02 2025 14:59:46 GMT+0000 (Coordinated Universal Time)
Image

Qty 90 with a 5hr run time.

Jason Newlun
Mon Apr 21 2025 13:46:55 GMT+0000 (Coordinated Universal Time)
Image

New EC: 05/12 (by Emily Marshall on 05/02/25 07:52 AM) New EC: 05/09 (by Emily Marshall on 05/02/25 06:00 AM) Assigned to Lou Lor, EC Date: 05/08.

Emily Marshall
Mon Apr 21 2025 12:44:55 GMT+0000 (Coordinated Universal Time)
Image

null.

Bryce Devine
Thu Apr 17 2025 17:54:11 GMT+0000 (Coordinated Universal Time)
Image

Assigned to Dan McDowell, EC Date: 05/07.

Emily Marshall
Mon Apr 07 2025 13:24:26 GMT+0000 (Coordinated Universal Time)
Image

Machine: Not Required <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Material: Closed <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Hardware: NA <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Mod: Closed <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Since Planned: 0 days Since Last Moved: 0 days .

System Generated Plan Status
Fri Apr 04 2025 19:09:12 GMT+0000 (Coordinated Universal Time)
Image

Assigned to Emily Marshall, EC Date: 04/04.

Emily Marshall
Fri Apr 04 2025 16:27:00 GMT+0000 (Coordinated Universal Time)
Image

Material sized PO 18538 Material 6061-T4 THK AMS 4026 Job number 30178-08 (90 pcs) Sheet size 48 X 144 1 SHEET, 33 X 76 1 SHEET, 48 X 21 1 SHEET Remaining rem NONE Location 2-K.

Randy Ho
Fri Apr 04 2025 13:37:55 GMT+0000 (Coordinated Universal Time)
Image

Waiting on Material size.

Emily Marshall
Thu Apr 03 2025 19:52:00 GMT+0000 (Coordinated Universal Time)
Image

Planning change to laser instead of outsource..

Derek Bodine
Thu Apr 03 2025 17:35:36 GMT+0000 (Coordinated Universal Time)
Image

Assigned to Emily Marshall, EC Date: 03/21.

Emily Marshall
Fri Mar 21 2025 17:01:39 GMT+0000 (Coordinated Universal Time)
Image

In review.

Emily Marshall
Fri Mar 21 2025 16:55:32 GMT+0000 (Coordinated Universal Time)
Image

Waiting on MOD3.

Dustin Laberta
Wed Mar 19 2025 19:54:00 GMT+0000 (Coordinated Universal Time)
Image

Assigned to Randy Ho, EC Date: 03/19.

Randy Ho
Wed Mar 19 2025 16:51:18 GMT+0000 (Coordinated Universal Time)
Image

Material lead time in m-days: Outsource Need material dock date: 5/1/25 from Outsource complete Material risks and mitigation: Repeat Parts, use same vendor Finishing/Processing risk and mitigation: Chem only, Jemco Finishing Expected Outside processing time in m-days: 10 (anticipate batching, 18 lines of similar parts) Operational Complexity: 3 Operational risks and mitigation: Coordination challenge, 18 variations on similar parts running largely through Outsource that must all complete at the same time. .

Gregg Marshall
Tue Mar 18 2025 23:07:45 GMT+0000 (Coordinated Universal Time)
Image

<b>Material lead time in M days:</b> 10 <b>Needed Material Dock Date:</b> 04/02/2025 <b>Material Risks: </b> None <b>Expected Outside Processing in M days: </b>15 <b>Finishing Risks: </b>None <b>Part Complexity: </b> 2 - Basic <b>Operational Risks: </b> None.

Gregg Marshall
Mon Mar 17 2025 07:00:00 GMT+0000 (Coordinated Universal Time)

Part History is currently not available. Check back soon!

Clocking In & Out

Q: Do I have to enter a step number?

A: Yes, if you are clocking in or out of a job you must enter a step number.

Q: How do I know the current step number?

A: Find the work order OR enter a job number and review time tickets. It should be clear what step number is current. For Workcenters not associated with the planning, i.e. New Orders, MFG Other, etc. A triple ZERO option should populate.

Q: Can I clock into two different step numbers at the same time?

A: Yes. If you are running two different operations at the same time you can click on the "select multiple" badge and then select additional operations. There is no limit.

Q: What if I need to move a job to a workcenter not available in the drop down?

A: Submit a planning change. The work order should reflect each step needed.

Q: BUT wait... The work order has a generic workcenter(i.e. INSPECT) and I need to move the job to the CMM-HEXLG1 queue.

A: Get a manger or lead to sign off on the change. **For inspection move to planned workcenter and inspector will be prompted to enter Machine.

CNC Programming

Q: How do I clock in & out for a re-post?

Option A: Click on the purple report link when prompted. Enter job number and step number. Clock in.
Option B: Go to zones --> Re-Post. Enter job number and step number. Clock in.

Clocking Out:You can not clock out without reporting a quantity. Enter last reported quantity when alerted. To force the alert enter a quantity of 1 or greater OR click "Clock out".