Clock In and Out
Zone Part History Time Tickets Comments Files Zone Part History Time Tickets Comments Files Clock
Select Multiple
Change Options
Overwrite Quantity
Update Comments only
...
Recent Time Tickets
All Open Closed 30597-05

By selecting a zone the data you see will be filtered to show only timetickets and jobs running for that specific zone.




Attach completed CMM report with manual measurements.

StepNo Doc Type Doc Name Upload By Date
undefined Bubble undefined undefined undefined
undefined XML undefined undefined undefined
undefined MOD3 undefined undefined undefined
undefined Drawing undefined undefined undefined
Image

Pending POC, MOD3, And clar on CLASS B requirement for finishing.

Ben Lo
Thu Aug 07 2025 16:34:22 GMT+0000 (Coordinated Universal Time)
Image

Pending POC and MOD3.

Ben Lo
Thu Aug 07 2025 16:03:51 GMT+0000 (Coordinated Universal Time)
Image

Pinged customer again on material selection. .

Tyler Deis
Fri Aug 01 2025 15:42:19 GMT+0000 (Coordinated Universal Time)
Image

New EC: 08/11 (by Ben Lo on 08/07/25 09:35 AM) New EC: 08/06 (by Tyler Deis on 08/01/25 08:41 AM) New EC: 07/31 (by Tyler Deis on 07/23/25 03:19 PM) New EC: 07/23 (by Tyler Deis on 07/22/25 07:36 AM) Assigned to Tyler Deis, EC Date: Invalid date.

Yia Lee
Tue Jul 22 2025 14:35:56 GMT+0000 (Coordinated Universal Time)
Image

Tyler is confirming with customer on the material sheet grade. Low carbon steel sheets at this thickness are A569 ''industry standard for sheet grade''. Customer is calling out A36. .

Yia Lee
Tue Jul 22 2025 14:34:06 GMT+0000 (Coordinated Universal Time)
Image

Machine: Not Required <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Material: HFM <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Hardware: NA <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Mod: Closed <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Since Planned: 0 days Since Last Moved: 0 days .

System Generated Plan Status
Thu Jul 17 2025 16:54:45 GMT+0000 (Coordinated Universal Time)
Image

..

Emily Marshall
Thu Jul 17 2025 16:07:00 GMT+0000 (Coordinated Universal Time)
Image

Waiting for PO approval. .

Yia Lee
Thu Jul 17 2025 13:36:33 GMT+0000 (Coordinated Universal Time)
Image

Material sized PO NEED STOCK Material A36 12GA Job number 30597-05 (5 pcs), 30597-06 (5 pcs), 30597-07 (8 PCS) Sheet size 48 X 120 3 SHEETS Remaining rem NONE Location RECIEVING THIS SHEET SIZE WILL RUN ALL 3 JOBS WITH 2 PCS EXTRA PER JOB IF YIA CAN FIND 48 WIDE WE WILL BE ABLE TO SAVE A FULL SHEET.

Randy Ho
Thu Jul 17 2025 12:53:44 GMT+0000 (Coordinated Universal Time)
Image

Followed up with Yia via email 7/17 526am on purchasing material .

Emily Marshall
Thu Jul 17 2025 12:26:47 GMT+0000 (Coordinated Universal Time)
Image

Waiting on material to purchase.

Emily Marshall
Tue Jul 15 2025 13:29:38 GMT+0000 (Coordinated Universal Time)
Image

Reached out to Dan and Tyler on being able to hit holes with tolerance of .006/ Also reached out to Tyler to have tolerance removed and just have the true position tolerance to hit 7/14 at 959am.

Emily Marshall
Mon Jul 14 2025 17:11:57 GMT+0000 (Coordinated Universal Time)
Image

Randy sizing material.

Emily Marshall
Mon Jul 14 2025 17:04:58 GMT+0000 (Coordinated Universal Time)
Image

..

Emily Marshall
Mon Jul 14 2025 16:09:04 GMT+0000 (Coordinated Universal Time)
Image

Dim check complete. No shop aid required.

undefined
Mon Jul 14 2025 13:40:19 GMT+0000 (Coordinated Universal Time)
Image

<b>Material lead time in M days:</b> 5 <b>Needed Material Dock Date:</b> 07/28/2025 <b>Material Risks: </b> None <b>Expected Outside Processing in M days: </b>10 <b>Finishing Risks: </b>None <b>Part Complexity: </b> 2 - Basic <b>Operational Risks: </b> None.

Tyler Deis
Thu Jul 10 2025 07:00:00 GMT+0000 (Coordinated Universal Time)

Part History is currently not available. Check back soon!

Clocking In & Out

Q: Do I have to enter a step number?

A: Yes, if you are clocking in or out of a job you must enter a step number.

Q: How do I know the current step number?

A: Find the work order OR enter a job number and review time tickets. It should be clear what step number is current. For Workcenters not associated with the planning, i.e. New Orders, MFG Other, etc. A triple ZERO option should populate.

Q: Can I clock into two different step numbers at the same time?

A: Yes. If you are running two different operations at the same time you can click on the "select multiple" badge and then select additional operations. There is no limit.

Q: What if I need to move a job to a workcenter not available in the drop down?

A: Submit a planning change. The work order should reflect each step needed.

Q: BUT wait... The work order has a generic workcenter(i.e. INSPECT) and I need to move the job to the CMM-HEXLG1 queue.

A: Get a manger or lead to sign off on the change. **For inspection move to planned workcenter and inspector will be prompted to enter Machine.

CNC Programming

Q: How do I clock in & out for a re-post?

Option A: Click on the purple report link when prompted. Enter job number and step number. Clock in.
Option B: Go to zones --> Re-Post. Enter job number and step number. Clock in.

Clocking Out:You can not clock out without reporting a quantity. Enter last reported quantity when alerted. To force the alert enter a quantity of 1 or greater OR click "Clock out".