Clock In and Out
Zone Part History Time Tickets Comments Files Zone Part History Time Tickets Comments Files Clock
Select Multiple
Change Options
Overwrite Quantity
Update Comments only
...
Recent Time Tickets
All Open Closed 30133-04

By selecting a zone the data you see will be filtered to show only timetickets and jobs running for that specific zone.




Attach completed CMM report with manual measurements.

StepNo Doc Type Doc Name Upload By Date
undefined Drawing undefined undefined undefined
undefined Bubble undefined undefined undefined
undefined XML undefined undefined undefined
undefined MOD3 undefined undefined undefined
Image

Move to material stage.

Yia Lee
Fri Aug 22 2025 14:36:35 GMT+0000 (Coordinated Universal Time)
Image

Material is OK to use as is. Moving to Issue Material..

Gregg Marshall
Thu Aug 21 2025 16:42:31 GMT+0000 (Coordinated Universal Time)
Image

Pinged Dave. .

Yia Lee
Thu Aug 14 2025 16:25:47 GMT+0000 (Coordinated Universal Time)
Image

New EC: 08/19 (by Dave Barr on 08/14/25 09:45 AM) Assigned to Dave Barr, EC Date: 08/13.

AJ Moore
Tue Aug 12 2025 17:32:39 GMT+0000 (Coordinated Universal Time)
Image

Pinged Dave for customer clarification on material spec..

Yia Lee
Mon Aug 11 2025 14:22:13 GMT+0000 (Coordinated Universal Time)
Image

Oder is on hold for clarification from customer. AMS5962 material is not in AMS2774 table spec. Pacmet needs to know if they can perform the age step of the S1750DP (condition II age) process in AMS2774 Table 4. .

Yia Lee
Thu Aug 07 2025 16:38:37 GMT+0000 (Coordinated Universal Time)
Image

Pacmet system has been down which caused delays on this order. Once they catch up with their backlog, they'll confirm new EC dates. .

Yia Lee
Tue Aug 05 2025 16:48:30 GMT+0000 (Coordinated Universal Time)
Image

Requested date relief from buyer - planned ship date 9/29 .

Dave Barr
Mon Aug 04 2025 17:30:15 GMT+0000 (Coordinated Universal Time)
Image

Failure analysis complete.

undefined
Mon Jul 14 2025 20:53:47 GMT+0000 (Coordinated Universal Time)
Image

Machine: Ready <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Material: HFM <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Hardware: NA <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Mod: Closed <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Since Planned: 0 days Since Last Moved: 2 days .

System Generated Plan Status
Mon Jul 14 2025 19:25:01 GMT+0000 (Coordinated Universal Time)
Image

..

Kristy Walton
Sat Jul 12 2025 15:26:05 GMT+0000 (Coordinated Universal Time)
Image

Waiting on MOD3.

Dustin Laberta
Thu Jul 10 2025 14:07:08 GMT+0000 (Coordinated Universal Time)
Image

In Programming.

Dustin Laberta
Mon Jun 30 2025 16:24:19 GMT+0000 (Coordinated Universal Time)
Image

Modified model reviewed and approved..

Zack Johnson
Mon Jun 30 2025 15:41:54 GMT+0000 (Coordinated Universal Time)
Image

Model Modified HF Review.

Jacob Kraemer
Mon Jun 30 2025 14:24:56 GMT+0000 (Coordinated Universal Time)
Image

per Jake K. - Zack did not complete before leaving for the day on 6/26 will complete on Monday 6/30.

Emily Marshall
Fri Jun 27 2025 18:07:38 GMT+0000 (Coordinated Universal Time)
Image

Assigned to Zack Johnson, EC Date: 06/30.

Emily Marshall
Fri Jun 27 2025 17:08:25 GMT+0000 (Coordinated Universal Time)
Image

Modified model created, dims verified. HF review..

Zack Johnson
Thu Jun 26 2025 21:31:16 GMT+0000 (Coordinated Universal Time)
Image

Received "REDLINE" drawing and model to resolve chamfer question. Engineer clarified that stock must be 1.50" MAX AMS5962 to meet the 220 KSI MINIMUM ULTIMATE TENSILE STRENGTH requirement.

Dave Barr
Thu Jun 26 2025 19:51:53 GMT+0000 (Coordinated Universal Time)
Image

Waiting for more quotes to compare price. .

Yia Lee
Thu Jun 26 2025 16:04:49 GMT+0000 (Coordinated Universal Time)
Image

Requested engineering support to correct drawing issues - Please provide engineering support - The attached model is the same one we already have on file with the two different chamfers. Please send the updated model. I also suggest we remove these material specs that will not meet the hardness requirements and update the max material thickness as was communicated through previous emails 2.00” max AMS5662 & AMS5663 cannot be heat treated to precipitation hardened to yield 220KSI minimum tensile as required by flag note 7 and should be removed as options - .

Dave Barr
Wed Jun 25 2025 15:58:34 GMT+0000 (Coordinated Universal Time)
Image

New EC: 07/03 (by Gregg Marshall on 06/26/25 10:05 AM) Assigned to Gregg Marshall, EC Date: 06/26.

Emily Marshall
Wed Jun 25 2025 15:46:07 GMT+0000 (Coordinated Universal Time)
Image

Reached out to Gregg via email 6/25 at 823am that the REDLINE drawing is not uploaded into the folder and have it uploaded into the folder..

Emily Marshall
Wed Jun 25 2025 15:38:12 GMT+0000 (Coordinated Universal Time)
Image

REDLINE drawing uploaded into Customer Folder. .

Emily Marshall
Wed Jun 25 2025 15:01:48 GMT+0000 (Coordinated Universal Time)
Image

In Programming. Darick Post #2 priority. EC 6/26.

Dustin Laberta
Wed Jun 25 2025 11:26:04 GMT+0000 (Coordinated Universal Time)
Image

Redline Drawing received 6/24 and placed in Folder. Moving Job off Hold..

Gregg Marshall
Tue Jun 24 2025 17:45:07 GMT+0000 (Coordinated Universal Time)
Image

Assigned to Dave Barr, EC Date: 07/01.

Dave Barr
Mon Jun 16 2025 16:15:34 GMT+0000 (Coordinated Universal Time)
Image

Modeling error clarified with the Customer, Redline correction under preparation..

Gregg Marshall
Fri Jun 13 2025 16:01:44 GMT+0000 (Coordinated Universal Time)
Image

HF clarification on potential modeling error. Two different chamfers on bottom of threads (.036 x 60° and .063 x 30°). Emailed Dave at 9:00AM 6/12.

Zack Johnson
Thu Jun 12 2025 16:00:49 GMT+0000 (Coordinated Universal Time)
Image

Assigned to Zack Johnson, EC Date: 06/12.

Zack Johnson
Wed Jun 11 2025 20:26:37 GMT+0000 (Coordinated Universal Time)
Image

DIM CHECK NEW REV.

Emily Marshall
Wed Jun 11 2025 19:44:44 GMT+0000 (Coordinated Universal Time)
Image

Assigned to Dave Barr, EC Date: 06/12.

Emily Marshall
Wed Jun 11 2025 14:16:08 GMT+0000 (Coordinated Universal Time)
Image

Have Rev A drawing on file and on customer PO. Altitude & E2 show Rev NC. Dave working. 6/11.

Kristy Walton
Wed Jun 11 2025 14:00:21 GMT+0000 (Coordinated Universal Time)
Image

Reached out to Gregg and Dave via email 256pm 6/10 that we will be late to the customer due to a material spec callout on the customer drawing unable to HT AMS 5662 or AMS 5663 to 220 KSI. Need to purchase material with ALT spec AMS 5962.

Emily Marshall
Tue Jun 10 2025 22:13:56 GMT+0000 (Coordinated Universal Time)
Image

Assigned to Emily Marshall, EC Date: 06/10.

Emily Marshall
Tue Jun 10 2025 16:56:01 GMT+0000 (Coordinated Universal Time)
Image

REMAKE ROUTER REF NCR#28688 SB: AMS 5962 IS: 5663-drawing issue on material callout.

Emily Marshall
Tue Jun 10 2025 15:08:01 GMT+0000 (Coordinated Universal Time)

Part History is currently not available. Check back soon!

Clocking In & Out

Q: Do I have to enter a step number?

A: Yes, if you are clocking in or out of a job you must enter a step number.

Q: How do I know the current step number?

A: Find the work order OR enter a job number and review time tickets. It should be clear what step number is current. For Workcenters not associated with the planning, i.e. New Orders, MFG Other, etc. A triple ZERO option should populate.

Q: Can I clock into two different step numbers at the same time?

A: Yes. If you are running two different operations at the same time you can click on the "select multiple" badge and then select additional operations. There is no limit.

Q: What if I need to move a job to a workcenter not available in the drop down?

A: Submit a planning change. The work order should reflect each step needed.

Q: BUT wait... The work order has a generic workcenter(i.e. INSPECT) and I need to move the job to the CMM-HEXLG1 queue.

A: Get a manger or lead to sign off on the change. **For inspection move to planned workcenter and inspector will be prompted to enter Machine.

CNC Programming

Q: How do I clock in & out for a re-post?

Option A: Click on the purple report link when prompted. Enter job number and step number. Clock in.
Option B: Go to zones --> Re-Post. Enter job number and step number. Clock in.

Clocking Out:You can not clock out without reporting a quantity. Enter last reported quantity when alerted. To force the alert enter a quantity of 1 or greater OR click "Clock out".