Clock In and Out
Zone Part History Time Tickets Comments Files Zone Part History Time Tickets Comments Files Clock
Select Multiple
Change Options
Overwrite Quantity
Update Comments only
...
Recent Time Tickets
All Open Closed 28901-05

By selecting a zone the data you see will be filtered to show only timetickets and jobs running for that specific zone.




Attach completed CMM report with manual measurements.

StepNo Doc Type Doc Name Upload By Date
undefined Drawing undefined undefined undefined
Image

Assigned to Dave Barr, EC Date: 08/18.

Emily Marshall
Thu Aug 14 2025 13:53:26 GMT+0000 (Coordinated Universal Time)
Image

Machine: Not Required <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Material: Outsourced Hardware: NA <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Mod: Pending Since Planned: 0 days Since Last Moved: 13 days .

System Generated Plan Status
Thu Aug 14 2025 13:51:15 GMT+0000 (Coordinated Universal Time)
Image

After FMEA meeting Phil reached out to Dave with open questions about making the assembly. 1.our internal dwgs and mods reviewed by customer and approved. 2. pulley system removed. 3. responsible for proof load testing 3. shipping crate. 4. updated finishing (will need clarification) and cleaning (will need cleaning spec)Will need a follow up meeting scheduled by Dave once we have received clarification. Email sent 8/13 at 1254pm.

Emily Marshall
Thu Aug 14 2025 13:51:15 GMT+0000 (Coordinated Universal Time)
Image

FMEA rescheduled for 8/12 at 1230pm.

Emily Marshall
Thu Aug 07 2025 21:06:33 GMT+0000 (Coordinated Universal Time)
Image

New EC: 07/29 (by Dave Barr on 07/22/25 10:03 AM) Assigned to Dave Barr, EC Date: 07/18.

Emily Marshall
Thu Jul 17 2025 12:52:37 GMT+0000 (Coordinated Universal Time)
Image

FMEA rescheduled and set for 7/16 at 10am.

Emily Marshall
Wed Jul 16 2025 12:14:31 GMT+0000 (Coordinated Universal Time)
Image

Waiting on FMEA MEETING 7/15 1pm.

Emily Marshall
Tue Jul 15 2025 13:42:09 GMT+0000 (Coordinated Universal Time)
Image

Part defined on new REDLINE as -4 cross member assembly.

Dave Barr
Thu Jul 10 2025 14:51:53 GMT+0000 (Coordinated Universal Time)
Image

PO revision corrected - TD127699_1_REDLINE 5_05_2025 Delivery TBD - quoted lead-time 20 weeks.

Dave Barr
Thu Jul 10 2025 07:47:00 GMT+0000 (Coordinated Universal Time)
Image

Pinger buyer to get correct revision on PO -.

Dave Barr
Mon Jun 16 2025 09:23:00 GMT+0000 (Coordinated Universal Time)
Image

Working with engineer to clarify materials - drawing has discrepancy between material grades and specs.

Dave Barr
Mon Mar 17 2025 11:22:00 GMT+0000 (Coordinated Universal Time)
Image

Working with engineer to clarify materials - drawing has discrepancy between material grades and specs.

Dave Barr
Fri Feb 21 2025 07:21:00 GMT+0000 (Coordinated Universal Time)
Image

Just following up on this clarification. Can your team evaluate our requested material substitutions using the revision ‘0’ REDLINE drawing? Once we have that we can proceed with fabrication..

Dave Barr
Tue Dec 31 2024 12:21:00 GMT+0000 (Coordinated Universal Time)
Image

material spec issue. Dave pinged again 11/14.

AJ Moore
Fri Nov 15 2024 13:28:00 GMT+0000 (Coordinated Universal Time)
Image

Pinged buyer for clarification on material specs 11/12.

Dave Barr
Tue Nov 12 2024 12:06:00 GMT+0000 (Coordinated Universal Time)
Image

New EC: 07/14 (by Dave Barr on 07/07/25 10:34 AM) New EC: 07/03 (by Dave Barr on 06/26/25 10:30 AM) New EC: 06/24 (by Dave Barr on 06/16/25 09:24 AM) New EC: 06/18 (by Dave Barr on 06/09/25 10:13 AM) New EC: 06/06 (by Dave Barr on 05/30/25 10:05 AM) New EC: 05/21 (by Dave Barr on 05/16/25 10:04 AM) New EC: 05/14 (by Dave Barr on 05/01/25 10:16 AM) New EC: 04/23 (by Dave Barr on 04/09/25 09:59 AM) New EC: 04/07 (by Dave Barr on 03/24/25 10:24 AM) New EC: 03/24 (by Dave Barr on 03/17/25 11:22 AM) New EC: 03/17 (by Dave Barr on 03/10/25 08:14 AM) New EC: 03/07 (by Dave Barr on 02/28/25 10:50 AM) New EC: 02/27 (by Dave Barr on 02/25/25 08:31 AM) New EC: 02/25 (by Dave Barr on 01/29/25 10:30 AM) New EC: 01/28 (by Dave Barr on 12/31/24 12:26 PM) New EC: 12/16 (by Dave Barr on 12/09/24 08:42 AM) New EC: 12/04 (by Dave Barr on 11/27/24 02:02 PM) New EC: 11/26 (by Dave Barr on 11/05/24 10:49 AM) New EC: 10/25 (by Dave Barr on 10/02/24 10:47 AM) New EC: 09/25 (by Dave Barr on 09/18/24 10:56 AM) New EC: 09/11 (by Dave Barr on 08/14/24 07:25 PM) Assigned to Dave Barr, EC Date: 08/14.

Dave Barr
Wed Aug 14 2024 19:24:51 GMT+0000 (Coordinated Universal Time)
Image

Assigned to , EC Date: 09/11.

Dave Barr
Wed Aug 14 2024 19:24:13 GMT+0000 (Coordinated Universal Time)
Image

Per Dave - Holding for updated drawing. Material specs are incorrect..

Derek Bodine
Wed Aug 07 2024 23:06:17 GMT+0000 (Coordinated Universal Time)
Image

D&D Welding Quote - P/N: TD127699-1 Qty: 1 Price: $14,000 Lead Time 6-8 Weeks Includes the following Details: Items 85, 90, 91, 97, and 98 to be made from A36 Items: 88, 89, 94, and 96 to be made from A572 Items: 93, 95, and 99 to be made from A500 Excludes the following: Details 86, 87, and 92 Finish/ Paint Proof Load Part Marking Assembly Proof Load (Optional): $1,200 .

Derek Bodine
Wed Aug 07 2024 23:00:47 GMT+0000 (Coordinated Universal Time)
Image

D&D refreshing quote.

Derek Bodine
Thu Aug 01 2024 20:07:31 GMT+0000 (Coordinated Universal Time)
Image

Pinged D&D for updated quote to redlined drawing..

Derek Bodine
Mon Jul 29 2024 23:23:41 GMT+0000 (Coordinated Universal Time)
Image

Confirm quote with D&D Welding.

Dave Barr
Thu Jul 25 2024 17:58:07 GMT+0000 (Coordinated Universal Time)
Image

Dave working.

Dustin Laberta
Thu Jul 11 2024 19:20:28 GMT+0000 (Coordinated Universal Time)
Image

Waiting on MOD3.

Dustin Laberta
Mon Jul 08 2024 18:46:55 GMT+0000 (Coordinated Universal Time)
Image

Assigned to Emily Marshall, EC Date: 07/08.

Emily Marshall
Mon Jul 08 2024 14:19:15 GMT+0000 (Coordinated Universal Time)

Part History is currently not available. Check back soon!

Clocking In & Out

Q: Do I have to enter a step number?

A: Yes, if you are clocking in or out of a job you must enter a step number.

Q: How do I know the current step number?

A: Find the work order OR enter a job number and review time tickets. It should be clear what step number is current. For Workcenters not associated with the planning, i.e. New Orders, MFG Other, etc. A triple ZERO option should populate.

Q: Can I clock into two different step numbers at the same time?

A: Yes. If you are running two different operations at the same time you can click on the "select multiple" badge and then select additional operations. There is no limit.

Q: What if I need to move a job to a workcenter not available in the drop down?

A: Submit a planning change. The work order should reflect each step needed.

Q: BUT wait... The work order has a generic workcenter(i.e. INSPECT) and I need to move the job to the CMM-HEXLG1 queue.

A: Get a manger or lead to sign off on the change. **For inspection move to planned workcenter and inspector will be prompted to enter Machine.

CNC Programming

Q: How do I clock in & out for a re-post?

Option A: Click on the purple report link when prompted. Enter job number and step number. Clock in.
Option B: Go to zones --> Re-Post. Enter job number and step number. Clock in.

Clocking Out:You can not clock out without reporting a quantity. Enter last reported quantity when alerted. To force the alert enter a quantity of 1 or greater OR click "Clock out".