By selecting a zone the data you see will be filtered to show only timetickets and jobs running for that specific zone.




Attach completed CMM report with manual measurements.

StepNo Doc Type Doc Name Upload By Date
undefined Drawing undefined undefined undefined
undefined Bubble undefined undefined undefined
undefined XML undefined undefined undefined
undefined MOD3 undefined undefined undefined
Image

Revised Rev A Drawing and Model received and in the Folder. Planning Change in Progress..

Gregg Marshall
Mon Aug 11 2025 20:11:28 GMT+0000 (Coordinated Universal Time)
Image

Blue Origin Engineering concurs and is revising the Drawing and Model. ECD 8/4..

Gregg Marshall
Thu Jul 31 2025 22:14:41 GMT+0000 (Coordinated Universal Time)
Image

HF model/print discrepancy. Zone F2 is 14x, s/b 10x. zone C2 is 2x, s/b 6x. Reached out to Gregg 11:57AM 7/31..

Zack Johnson
Thu Jul 31 2025 19:00:30 GMT+0000 (Coordinated Universal Time)
Image

Blue Origin engineering concurs with Zack's findings and is issuing a revised drawing. Email confirming engineering changes sent to Planning today..

Gregg Marshall
Wed Jul 30 2025 23:48:27 GMT+0000 (Coordinated Universal Time)
Image

New EC: 08/12 (by Gregg Marshall on 08/07/25 10:22 AM) New EC: 08/06 (by Dave Barr on 08/05/25 10:05 AM) New EC: 07/31 (by Zack Johnson on 07/31/25 09:40 AM) New EC: 08/04 (by Dave Barr on 07/29/25 10:55 AM) Assigned to Dave Barr, EC Date: 07/30.

Dave Barr
Tue Jul 29 2025 17:54:34 GMT+0000 (Coordinated Universal Time)
Image

Sent to engineering for clarification -.

Dave Barr
Tue Jul 29 2025 15:55:41 GMT+0000 (Coordinated Universal Time)
Image

HF model/print discrepancy. Zone F2 is 14x, s/b 2x. zone C2 is 2x, s/b 4x. Reached out to Dave + Gregg 8:36AM 7/29..

Zack Johnson
Tue Jul 29 2025 15:36:45 GMT+0000 (Coordinated Universal Time)
Image

HF model/print discrepancy. Zone F2 is 14x, s/b 2x. zone C2 is 2x, s/b 4x. Reached out to Dave + Gregg 8:36AM 7/29..

Zack Johnson
Tue Jul 29 2025 15:36:45 GMT+0000 (Coordinated Universal Time)
Image

Reached out to Derek via email 7/29 at 708am to receive clarity on note 6 if we need to remove material prior to USI .

Emily Marshall
Tue Jul 29 2025 14:28:21 GMT+0000 (Coordinated Universal Time)
Image

Reached out to Dave via email 7/29 at 727am to receive clarification on masking for ANO/CHEM FILM notes and advise we are running a high risk of being late to the customer..

Emily Marshall
Tue Jul 29 2025 14:27:50 GMT+0000 (Coordinated Universal Time)
Image

Machine: MFG Plan Material: Material Size Hardware: NA <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Mod: Pending Since Planned: 0 days Since Last Moved: 0 days .

System Generated Plan Status
Tue Jul 29 2025 14:26:39 GMT+0000 (Coordinated Universal Time)
Image

<b>Material lead time in M days:</b> 10 <b>Needed Material Dock Date:</b> 08/08/2025 <b>Material Risks: </b> None <b>Expected Outside Processing in M days: </b>15 <b>Finishing Risks: </b>None <b>Part Complexity: </b> 3 - Slightly Complex <b>Operational Risks: </b> None.

Gregg Marshall
Fri Jul 25 2025 07:00:00 GMT+0000 (Coordinated Universal Time)

Part History is currently not available. Check back soon!

Clocking In & Out

Q: Do I have to enter a step number?

A: Yes, if you are clocking in or out of a job you must enter a step number.

Q: How do I know the current step number?

A: Find the work order OR enter a job number and review time tickets. It should be clear what step number is current. For Workcenters not associated with the planning, i.e. New Orders, MFG Other, etc. A triple ZERO option should populate.

Q: Can I clock into two different step numbers at the same time?

A: Yes. If you are running two different operations at the same time you can click on the "select multiple" badge and then select additional operations. There is no limit.

Q: What if I need to move a job to a workcenter not available in the drop down?

A: Submit a planning change. The work order should reflect each step needed.

Q: BUT wait... The work order has a generic workcenter(i.e. INSPECT) and I need to move the job to the CMM-HEXLG1 queue.

A: Get a manger or lead to sign off on the change. **For inspection move to planned workcenter and inspector will be prompted to enter Machine.

CNC Programming

Q: How do I clock in & out for a re-post?

Option A: Click on the purple report link when prompted. Enter job number and step number. Clock in.
Option B: Go to zones --> Re-Post. Enter job number and step number. Clock in.

Clocking Out:You can not clock out without reporting a quantity. Enter last reported quantity when alerted. To force the alert enter a quantity of 1 or greater OR click "Clock out".