Clock In and Out
Zone Part History Time Tickets Comments Files Zone Part History Time Tickets Comments Files Clock
Select Multiple
Change Options
Overwrite Quantity
Update Comments only
...
Recent Time Tickets
All Open Closed 29303-06

By selecting a zone the data you see will be filtered to show only timetickets and jobs running for that specific zone.




Attach completed CMM report with manual measurements.

StepNo Doc Type Doc Name Upload By Date
undefined Drawing undefined undefined undefined
undefined Child Drawing undefined undefined undefined
undefined Bubble undefined undefined undefined
undefined XML undefined undefined undefined
undefined MOD3 undefined undefined undefined
Image

Move job to Hold. Davis is reaching back to the customer on acknowledgement for the new REV. .

Yia Lee
Wed Aug 13 2025 16:15:53 GMT+0000 (Coordinated Universal Time)
Image

Machine: Program Material: Out to Bid Hardware: NA <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Mod: Closed <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Since Planned: 0 days Since Last Moved: 16 days .

System Generated Plan Status
Wed Aug 13 2025 15:21:04 GMT+0000 (Coordinated Universal Time)
Image

Pinged NDE Labs on the quotes. .

Yia Lee
Wed Aug 13 2025 15:21:04 GMT+0000 (Coordinated Universal Time)
Image

Reach out to NDE Labs for Standard UT quote. .

Yia Lee
Mon Aug 11 2025 16:27:03 GMT+0000 (Coordinated Universal Time)
Image

Needs EDM before USI. .

Yia Lee
Fri Aug 08 2025 17:05:48 GMT+0000 (Coordinated Universal Time)
Image

Waiting for Element respond on quotes. Everyone else has no bided this USI call out. .

Yia Lee
Thu Aug 07 2025 16:54:35 GMT+0000 (Coordinated Universal Time)
Image

Mistras in Cali and Idaho does not have the equipment to cert the material to NASA-STD-5009B. Reach out to Element and NDE labs for quotes. .

Yia Lee
Wed Aug 06 2025 15:31:41 GMT+0000 (Coordinated Universal Time)
Image

Material not purchased yet. Prioritizing other jobs..

Dustin Laberta
Tue Aug 05 2025 16:56:08 GMT+0000 (Coordinated Universal Time)
Image

Mistras in Cali and Kent is are not able to USI this material. Reaching out to NDE Labs and Mistras in Idaho if they are able to USI per the NASA-STD-5009B spec. .

Yia Lee
Mon Aug 04 2025 14:57:09 GMT+0000 (Coordinated Universal Time)
Image

Material not purchased yet. Prioritizing other jobs..

Dustin Laberta
Mon Aug 04 2025 13:42:21 GMT+0000 (Coordinated Universal Time)
Image

In Programming. Nghia. EC 8/3 Might slide due to material not purchased yet and USI lead time, to focus on other jobs with material on hand..

Dustin Laberta
Fri Aug 01 2025 16:35:20 GMT+0000 (Coordinated Universal Time)
Image

In Programming. Nghia. EC 8/3 Might slide due to material not purchased yet and USI lead time, to focus on other jobs with material on hand..

Dustin Laberta
Thu Jul 31 2025 14:24:13 GMT+0000 (Coordinated Universal Time)
Image

In Programming. Nghia. EC 8/3.

Dustin Laberta
Wed Jul 30 2025 16:24:43 GMT+0000 (Coordinated Universal Time)
Image

Reprogramming for round bar due to rev change. EC 8/1.

Dustin Laberta
Tue Jul 29 2025 16:47:30 GMT+0000 (Coordinated Universal Time)
Image

Reviewing programs. EC 7/29.

Dustin Laberta
Mon Jul 28 2025 16:34:41 GMT+0000 (Coordinated Universal Time)
Image

Remake line, Reference NCR# 29416. Parts undersized (likely due from over etching).

Ben Lo
Mon Jul 28 2025 14:18:40 GMT+0000 (Coordinated Universal Time)
Image

Remake line, Reference NCR# 29416 .

Ben Lo
Mon Jul 28 2025 13:30:15 GMT+0000 (Coordinated Universal Time)

Part History is currently not available. Check back soon!

Clocking In & Out

Q: Do I have to enter a step number?

A: Yes, if you are clocking in or out of a job you must enter a step number.

Q: How do I know the current step number?

A: Find the work order OR enter a job number and review time tickets. It should be clear what step number is current. For Workcenters not associated with the planning, i.e. New Orders, MFG Other, etc. A triple ZERO option should populate.

Q: Can I clock into two different step numbers at the same time?

A: Yes. If you are running two different operations at the same time you can click on the "select multiple" badge and then select additional operations. There is no limit.

Q: What if I need to move a job to a workcenter not available in the drop down?

A: Submit a planning change. The work order should reflect each step needed.

Q: BUT wait... The work order has a generic workcenter(i.e. INSPECT) and I need to move the job to the CMM-HEXLG1 queue.

A: Get a manger or lead to sign off on the change. **For inspection move to planned workcenter and inspector will be prompted to enter Machine.

CNC Programming

Q: How do I clock in & out for a re-post?

Option A: Click on the purple report link when prompted. Enter job number and step number. Clock in.
Option B: Go to zones --> Re-Post. Enter job number and step number. Clock in.

Clocking Out:You can not clock out without reporting a quantity. Enter last reported quantity when alerted. To force the alert enter a quantity of 1 or greater OR click "Clock out".