Clock In and Out
Zone Part History Time Tickets Comments Files Zone Part History Time Tickets Comments Files Clock
Select Multiple
Change Options
Overwrite Quantity
Update Comments only
...
Recent Time Tickets
All Open Closed 30577-02

By selecting a zone the data you see will be filtered to show only timetickets and jobs running for that specific zone.




Attach completed CMM report with manual measurements.

StepNo Doc Type Doc Name Upload By Date
undefined Drawing undefined undefined undefined
undefined Other undefined undefined undefined
undefined Bubble undefined undefined undefined
undefined XML undefined undefined undefined
undefined MOD3 undefined undefined undefined
Image

Machine: Program Material: Closed <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Hardware: HFM <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Mod: Closed <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Since Planned: 0 days Since Last Moved: 15 days .

System Generated Plan Status
Wed Aug 13 2025 20:25:52 GMT+0000 (Coordinated Universal Time)
Image

In programming.

Emily Marshall
Mon Aug 04 2025 12:49:17 GMT+0000 (Coordinated Universal Time)
Image

Review complete, files moved to derivative folder..

undefined
Mon Jul 28 2025 18:04:24 GMT+0000 (Coordinated Universal Time)
Image

Modified model and shop aid drawing created, dims verified. HF review. .

Zack Johnson
Thu Jul 24 2025 03:57:38 GMT+0000 (Coordinated Universal Time)
Image

Modified model and shop aid drawing in progress. .

Zack Johnson
Thu Jul 24 2025 00:20:07 GMT+0000 (Coordinated Universal Time)
Image

From Blue Origin Engineering: Looks like we got some numbers switched around.  Note 14 should be pointed at the masked areas, we want to alodine them after we masked them from anodize. Note 15 is correct but may not be super clear. Prior to the seal application, we want to make sure the surface the seal is bonding to is cleaned. We get a corrected drawing to you..

Gregg Marshall
Mon Jul 21 2025 23:15:09 GMT+0000 (Coordinated Universal Time)
Image

Dim check, rivets holes need to be added for nutplate. Need clarification if the countersink holes will cause a discrepancy with masking callout .

Randy Ho
Mon Jul 14 2025 19:01:41 GMT+0000 (Coordinated Universal Time)
Image

Requested clarification from buyer.

Dave Barr
Mon Jul 14 2025 14:40:35 GMT+0000 (Coordinated Universal Time)
Image

New EC: 07/21 (by Dave Barr on 07/14/25 07:40 AM) New EC: 07/10 (by Randy Ho on 07/09/25 10:31 AM) New EC: Invalid date (by Randy Ho on 07/09/25 10:30 AM) Assigned to Dave Barr, EC Date: Invalid date.

Randy Ho
Wed Jul 09 2025 17:30:13 GMT+0000 (Coordinated Universal Time)
Image

Moved to hold and assigned to Dave Barr. Need clarification on FN 14 chem after anodize being called out to a rubber adhesive seal. FN 15 surface prep prior to adhesive seal pointing at opposite side of where the seal is supposed to be assembled Order of operation to chem first then ANO or Ano first then chem only masked spots. Dave to reach out to Customer may need a revised drawing .

Randy Ho
Wed Jul 09 2025 17:30:04 GMT+0000 (Coordinated Universal Time)
Image

<b>Material lead time in M days:</b> 20 <b>Needed Material Dock Date:</b> 08/05/2025 <b>Material Risks: </b> None <b>Expected Outside Processing in M days: </b>17 <b>Finishing Risks: </b>None <b>Part Complexity: </b> 5 - Medium <b>Operational Risks: </b> None.

Dave Barr
Mon Jul 07 2025 07:00:00 GMT+0000 (Coordinated Universal Time)

Part History is currently not available. Check back soon!

Clocking In & Out

Q: Do I have to enter a step number?

A: Yes, if you are clocking in or out of a job you must enter a step number.

Q: How do I know the current step number?

A: Find the work order OR enter a job number and review time tickets. It should be clear what step number is current. For Workcenters not associated with the planning, i.e. New Orders, MFG Other, etc. A triple ZERO option should populate.

Q: Can I clock into two different step numbers at the same time?

A: Yes. If you are running two different operations at the same time you can click on the "select multiple" badge and then select additional operations. There is no limit.

Q: What if I need to move a job to a workcenter not available in the drop down?

A: Submit a planning change. The work order should reflect each step needed.

Q: BUT wait... The work order has a generic workcenter(i.e. INSPECT) and I need to move the job to the CMM-HEXLG1 queue.

A: Get a manger or lead to sign off on the change. **For inspection move to planned workcenter and inspector will be prompted to enter Machine.

CNC Programming

Q: How do I clock in & out for a re-post?

Option A: Click on the purple report link when prompted. Enter job number and step number. Clock in.
Option B: Go to zones --> Re-Post. Enter job number and step number. Clock in.

Clocking Out:You can not clock out without reporting a quantity. Enter last reported quantity when alerted. To force the alert enter a quantity of 1 or greater OR click "Clock out".