Clock In and Out
Zone Part History Time Tickets Comments Files Zone Part History Time Tickets Comments Files Clock
Select Multiple
Change Options
Overwrite Quantity
Update Comments only
...
Recent Time Tickets
All Open Closed 30652-18

By selecting a zone the data you see will be filtered to show only timetickets and jobs running for that specific zone.




Attach completed CMM report with manual measurements.

StepNo Doc Type Doc Name Upload By Date
undefined Drawing undefined undefined undefined
undefined Other undefined undefined undefined
Image

Assigned to Manuel DeSantiago, EC Date: 08/14.

Virginia Mitchell
Thu Aug 14 2025 14:04:50 GMT+0000 (Coordinated Universal Time)
Image

WIP- Assemble Parts Per Drawing.

Virginia Mitchell
Thu Aug 14 2025 14:01:39 GMT+0000 (Coordinated Universal Time)
Image

As Assembling-We noticed Item #2 are already installed. Question is what do we put on the w/o as we no info. Item #5 has -005on the Bom and on the plate it has the -205. WE are Just confirming it's correct..

Virginia Mitchell
Wed Aug 13 2025 16:44:25 GMT+0000 (Coordinated Universal Time)
Image

As Assembling-Item #2 are already installed. Question is what do we put on the w/o as we no info. Item #5 has -005on the Bom and on the plate it has the -205. WE are Just confirming it's correct..

Virginia Mitchell
Wed Aug 13 2025 16:43:15 GMT+0000 (Coordinated Universal Time)
Image

WIP on Organizing Assembly Process /Moving W/O into Assembly as they are Getting Done.

Virginia Mitchell
Tue Aug 12 2025 14:21:07 GMT+0000 (Coordinated Universal Time)
Image

WIP on Organizing Assembly Process /Moving W/O into Assembly as they are Getting Done.

Virginia Mitchell
Fri Aug 08 2025 17:37:15 GMT+0000 (Coordinated Universal Time)
Image

New EC: Invalid date (by Virginia Mitchell on 08/13/25 09:38 AM) Assigned to , EC Date: Invalid date.

Virginia Mitchell
Fri Aug 08 2025 14:14:00 GMT+0000 (Coordinated Universal Time)
Image

Moving W/O into Assembly as they are Getting Done.

Virginia Mitchell
Thu Aug 07 2025 21:52:41 GMT+0000 (Coordinated Universal Time)
Image

VA Confirming Torque Sheet before Moving forward with these details.

Virginia Mitchell
Wed Aug 06 2025 16:35:49 GMT+0000 (Coordinated Universal Time)
Image

Machine: Not Required <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Material: NA <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Hardware: HFM <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Mod: Pending Since Planned: 0 days Since Last Moved: 0 days .

System Generated Plan Status
Fri Aug 01 2025 15:09:56 GMT+0000 (Coordinated Universal Time)
Image

Received spreadsheet for torque values for fasteners from customer. Will update lines -02 thru -29 to reference torque values provided..

Ben Lo
Thu Jul 31 2025 17:06:16 GMT+0000 (Coordinated Universal Time)
Image

Assigned to , EC Date: 07/31.

Ben Lo
Thu Jul 31 2025 17:04:37 GMT+0000 (Coordinated Universal Time)
Image

Assigned to AJ Moore, EC Date: 07/30.

Ben Lo
Wed Jul 30 2025 14:00:53 GMT+0000 (Coordinated Universal Time)
Image

Hold for Kuiper Standard Doc 68 spec for torquing. Requested from AJ/Christine on 7/28..

undefined
Wed Jul 30 2025 14:00:42 GMT+0000 (Coordinated Universal Time)
Image

No Op Notes (see -01).

Christine Cross
Mon Jul 28 2025 11:44:00 GMT+0000 (Coordinated Universal Time)

Part History is currently not available. Check back soon!

Clocking In & Out

Q: Do I have to enter a step number?

A: Yes, if you are clocking in or out of a job you must enter a step number.

Q: How do I know the current step number?

A: Find the work order OR enter a job number and review time tickets. It should be clear what step number is current. For Workcenters not associated with the planning, i.e. New Orders, MFG Other, etc. A triple ZERO option should populate.

Q: Can I clock into two different step numbers at the same time?

A: Yes. If you are running two different operations at the same time you can click on the "select multiple" badge and then select additional operations. There is no limit.

Q: What if I need to move a job to a workcenter not available in the drop down?

A: Submit a planning change. The work order should reflect each step needed.

Q: BUT wait... The work order has a generic workcenter(i.e. INSPECT) and I need to move the job to the CMM-HEXLG1 queue.

A: Get a manger or lead to sign off on the change. **For inspection move to planned workcenter and inspector will be prompted to enter Machine.

CNC Programming

Q: How do I clock in & out for a re-post?

Option A: Click on the purple report link when prompted. Enter job number and step number. Clock in.
Option B: Go to zones --> Re-Post. Enter job number and step number. Clock in.

Clocking Out:You can not clock out without reporting a quantity. Enter last reported quantity when alerted. To force the alert enter a quantity of 1 or greater OR click "Clock out".