Clock In and Out
Zone Part History Time Tickets Comments Files Zone Part History Time Tickets Comments Files Clock
130 100 110 120
Change Options
Overwrite Quantity
Update Comments only
...
Recent Time Tickets
FPBO Queue All Open Closed 30456-16
You are only viewing data for this zone.
HAAS19

By selecting a zone the data you see will be filtered to show only timetickets and jobs running for that specific zone.




Attach completed CMM report with manual measurements.

StepNo Doc Type Doc Name Upload By Date
undefined Drawing undefined undefined undefined
undefined Bubble undefined undefined undefined
undefined XML undefined undefined undefined
undefined MOD3 undefined undefined undefined
Image

null.

Pao Yang
Mon Jun 23 2025 17:43:06 GMT+0000 (Coordinated Universal Time)
Image

5hr Run time.

Emily Marshall
Mon Jun 23 2025 16:45:07 GMT+0000 (Coordinated Universal Time)
Image

Qty 30. 10min a part.

Jason Newlun
Mon Jun 23 2025 14:12:41 GMT+0000 (Coordinated Universal Time)
Image

null.

James Stripling
Mon Jun 23 2025 01:36:11 GMT+0000 (Coordinated Universal Time)
Image

New EC: 06/24 (by Emily Marshall on 06/23/25 09:43 AM) Assigned to Jason Newlun, EC Date: 06/23.

Emily Marshall
Fri Jun 20 2025 12:06:38 GMT+0000 (Coordinated Universal Time)
Image

2hr 30min run time.

Emily Marshall
Fri Jun 20 2025 12:05:53 GMT+0000 (Coordinated Universal Time)
Image

Qty 30. 5min a part.

Jason Newlun
Thu Jun 19 2025 14:15:03 GMT+0000 (Coordinated Universal Time)
Image

null.

Bryce Devine
Wed Jun 18 2025 19:18:03 GMT+0000 (Coordinated Universal Time)
Image

Assigned to Dan McDowell, EC Date: 06/18.

Emily Marshall
Wed Jun 18 2025 12:37:28 GMT+0000 (Coordinated Universal Time)
Image

issue material.

Ben Lo
Tue Jun 17 2025 20:05:32 GMT+0000 (Coordinated Universal Time)
Image

Machine: Ready <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Material: Closed <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Hardware: NA <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Mod: Closed <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Since Planned: 0 days Since Last Moved: 0 days .

System Generated Plan Status
Tue Jun 17 2025 20:04:39 GMT+0000 (Coordinated Universal Time)
Image

..

Dustin Laberta
Tue Jun 17 2025 11:45:09 GMT+0000 (Coordinated Universal Time)
Image

In Programming.

Dustin Laberta
Wed Jun 11 2025 15:05:57 GMT+0000 (Coordinated Universal Time)
Image

Material sized PO NEED STOCK Material 2024-T3 .050 THK BARE Job number 30456-16 (26 pcs), Sheet size 48 X 144 Remaining rem NONE Location RECIEVING.

Randy Ho
Tue Jun 10 2025 15:15:09 GMT+0000 (Coordinated Universal Time)
Image

New BOM added from part history.

Randy Ho
Mon Jun 09 2025 20:06:56 GMT+0000 (Coordinated Universal Time)

Part History is currently not available. Check back soon!

Clocking In & Out

Q: Do I have to enter a step number?

A: Yes, if you are clocking in or out of a job you must enter a step number.

Q: How do I know the current step number?

A: Find the work order OR enter a job number and review time tickets. It should be clear what step number is current. For Workcenters not associated with the planning, i.e. New Orders, MFG Other, etc. A triple ZERO option should populate.

Q: Can I clock into two different step numbers at the same time?

A: Yes. If you are running two different operations at the same time you can click on the "select multiple" badge and then select additional operations. There is no limit.

Q: What if I need to move a job to a workcenter not available in the drop down?

A: Submit a planning change. The work order should reflect each step needed.

Q: BUT wait... The work order has a generic workcenter(i.e. INSPECT) and I need to move the job to the CMM-HEXLG1 queue.

A: Get a manger or lead to sign off on the change. **For inspection move to planned workcenter and inspector will be prompted to enter Machine.

CNC Programming

Q: How do I clock in & out for a re-post?

Option A: Click on the purple report link when prompted. Enter job number and step number. Clock in.
Option B: Go to zones --> Re-Post. Enter job number and step number. Clock in.

Clocking Out:You can not clock out without reporting a quantity. Enter last reported quantity when alerted. To force the alert enter a quantity of 1 or greater OR click "Clock out".