190: ANY MACHINE SHOP SUPPORT
Accepted: 0- Rej: 0
Fri Aug 29 2025 20:39:08 GMT+0000 (Coordinated Universal Time)
Bryce Devine
12000-01
General Shop
Open -
120: SHIPPING SHIP
Accepted: 0- Rej: 0
Fri Aug 29 2025 20:34:03 GMT+0000 (Coordinated Universal Time)
Jarron Ransford
30652-21
159508-201
Open -
170: FAI PAPERWORK
Accepted: 0- Rej: 0
Fri Aug 29 2025 20:30:19 GMT+0000 (Coordinated Universal Time)
Kristy Walton
30125-04
A20006-20
Fri Aug 29 2025 20:30:00 GMT+0000 (Coordinated Universal Time)
Closed -
110: MAZAKLASER LASER CUT
Accepted: 0- Rej: 0
Fri Aug 29 2025 20:24:06 GMT+0000 (Coordinated Universal Time)
Bryce Devine
30705-04
418-201-2111-201
Fri Aug 29 2025 20:35:24 GMT+0000 (Coordinated Universal Time)
Closed -
110: OUTPLANT CHEM/POWDER
Accepted: 0- Rej: 0
Fri Aug 29 2025 20:16:18 GMT+0000 (Coordinated Universal Time)
Kathleen Chang
30159-20
C193505-3461
Fri Aug 29 2025 20:16:00 GMT+0000 (Coordinated Universal Time)
Closed -
170: OUTPLANT CHEM/ANODIZE
Accepted: 0- Rej: 0
Fri Aug 29 2025 20:16:17 GMT+0000 (Coordinated Universal Time)
Kathleen Chang
30660-01
002321-1
Fri Aug 29 2025 20:16:00 GMT+0000 (Coordinated Universal Time)
Closed -
150: OUTPLANT CHEM/PRIMER/PAINT
Accepted: 0- Rej: 0
Fri Aug 29 2025 20:16:17 GMT+0000 (Coordinated Universal Time)
Kathleen Chang
30772-01
H11795-211
Fri Aug 29 2025 20:16:00 GMT+0000 (Coordinated Universal Time)
Closed -
140: OUTPLANT CHEM/PRIMER/PAINT
Accepted: 0- Rej: 0
Fri Aug 29 2025 20:16:17 GMT+0000 (Coordinated Universal Time)
Kathleen Chang
30698-05
C193505-3527
Fri Aug 29 2025 20:16:00 GMT+0000 (Coordinated Universal Time)
Closed -
140: OUTPLANT CHEM/PRIMER/PAINT
Accepted: 0- Rej: 0
Fri Aug 29 2025 20:16:16 GMT+0000 (Coordinated Universal Time)
Kathleen Chang
30698-06
C193505-3525
Fri Aug 29 2025 20:16:00 GMT+0000 (Coordinated Universal Time)
Closed -
170: OUTPLANT LPI/ANO/PRIMER
Accepted: 0- Rej: 0
Fri Aug 29 2025 20:16:16 GMT+0000 (Coordinated Universal Time)
Kathleen Chang
30681-11
DS4185-710-3005
Fri Aug 29 2025 20:17:00 GMT+0000 (Coordinated Universal Time)
Closed -
120: OUTPLANT PRIMER/PAINT
Accepted: 0- Rej: 0
Fri Aug 29 2025 20:16:15 GMT+0000 (Coordinated Universal Time)
Kathleen Chang
30560-01
J342101-37EAAA
Fri Aug 29 2025 20:17:00 GMT+0000 (Coordinated Universal Time)
Closed -
300: FAI PAPERWORK
Accepted: 0- Rej: 0
Fri Aug 29 2025 20:13:24 GMT+0000 (Coordinated Universal Time)
Sean Perry
30361-04
C253505-3514
Fri Aug 29 2025 20:13:00 GMT+0000 (Coordinated Universal Time)
Closed -
110: ANY MACHINE TRAINING
Accepted: 0- Rej: 0
Fri Aug 29 2025 20:09:05 GMT+0000 (Coordinated Universal Time)
Paolo Gomez
12000-01
General Shop
Open -
130: ANY MACHINE CLEANING
Accepted: 0- Rej: 0
Fri Aug 29 2025 20:06:47 GMT+0000 (Coordinated Universal Time)
Seng Lor
12000-01
General Shop
Open -
120: RECEIVING RECV INSPECT
Accepted: 0- Rej: 0
Fri Aug 29 2025 20:02:47 GMT+0000 (Coordinated Universal Time)
Lauren Bodine
30584-01
382-331-7303-002
Fri Aug 29 2025 20:20:00 GMT+0000 (Coordinated Universal Time)
Closed -
130: HAAS5 MILL OP1
Accepted: 0- Rej: 0
Fri Aug 29 2025 20:02:27 GMT+0000 (Coordinated Universal Time)
Jordan Henry
30256-30
418-201-1002-512
Open -
0: OUTSOURCED OUTSOURCED
Accepted: 0- Rej: 0
Fri Aug 29 2025 20:02:08 GMT+0000 (Coordinated Universal Time)
Lauren Bodine
30584-01
382-331-7303-002
Fri Aug 29 2025 20:02:00 GMT+0000 (Coordinated Universal Time)
Closed -
170: SHIPPING SHIP
Accepted: 0- Rej: 0
Fri Aug 29 2025 19:59:40 GMT+0000 (Coordinated Universal Time)
Nathan Ly
30447-02
156343-252
Open -
340: FAI PAPERWORK
Accepted: 0- Rej: 0
Fri Aug 29 2025 19:58:26 GMT+0000 (Coordinated Universal Time)
Sean Perry
29363-01
001-143-1028-101
Fri Aug 29 2025 20:02:00 GMT+0000 (Coordinated Universal Time)
Closed -
100: MATERIAL ISSUE MATERIAL
Accepted: 50- Rej: 0
Fri Aug 29 2025 19:56:58 GMT+0000 (Coordinated Universal Time)
Charlie Vang
30671-02
449-010-177-101
Fri Aug 29 2025 19:56:58 GMT+0000 (Coordinated Universal Time)
Closed -
110: FINAL INSP FINAL INSP
Accepted: 0- Rej: 0
Fri Aug 29 2025 19:56:52 GMT+0000 (Coordinated Universal Time)
Andy Lor
30106-07
C304525-0341
Open -
170: INSPECT PRE-OSP INSP
Accepted: 60- Rej: 0
Fri Aug 29 2025 19:53:51 GMT+0000 (Coordinated Universal Time)
Phil So
30410-04
418-201-5000-421
Fri Aug 29 2025 19:53:51 GMT+0000 (Coordinated Universal Time)
Closed -
120: HAAS6 MILL OP1
Accepted: 0- Rej: 0
Fri Aug 29 2025 19:53:36 GMT+0000 (Coordinated Universal Time)
Bryan Choi
30614-06
131087-001
Open -
190: RECEIVING PAINT
Accepted: 0- Rej: 0
Fri Aug 29 2025 19:53:00 GMT+0000 (Coordinated Universal Time)
Lauren Bodine
30566-13
149549-021
Fri Aug 29 2025 19:53:00 GMT+0000 (Coordinated Universal Time)
Closed -
190: OUTPLANTL PAINT
Accepted: 0- Rej: 0
Fri Aug 29 2025 19:52:46 GMT+0000 (Coordinated Universal Time)
Lauren Bodine
30566-13
149549-021
Fri Aug 29 2025 19:52:00 GMT+0000 (Coordinated Universal Time)
Closed -
290: ANY MACHINE TASK MANAGER
Accepted: 0- Rej: 0
Fri Aug 29 2025 19:52:41 GMT+0000 (Coordinated Universal Time)
Bryan Choi
12000-01
General Shop
Fri Aug 29 2025 19:53:00 GMT+0000 (Coordinated Universal Time)
Closed -
110: FINAL INSP FINAL INSP
Accepted: 0- Rej: 0
Fri Aug 29 2025 19:51:27 GMT+0000 (Coordinated Universal Time)
Kristy Walton
30106-07
C304525-0341
Fri Aug 29 2025 20:32:00 GMT+0000 (Coordinated Universal Time)
Closed -
160: RECEIVING CHROME
Accepted: 0- Rej: 0
Fri Aug 29 2025 19:47:02 GMT+0000 (Coordinated Universal Time)
Lauren Bodine
29873-11
C304525-2511
Fri Aug 29 2025 19:49:00 GMT+0000 (Coordinated Universal Time)
Closed -
160: OUTPLANTL CHROME
Accepted: 0- Rej: 0
Fri Aug 29 2025 19:46:47 GMT+0000 (Coordinated Universal Time)
Lauren Bodine
29873-11
C304525-2511
Fri Aug 29 2025 19:46:00 GMT+0000 (Coordinated Universal Time)
Closed -
300: FAB FAB PROGRAMMING
Accepted: 0- Rej: 0
Fri Aug 29 2025 19:46:40 GMT+0000 (Coordinated Universal Time)
Dan McDowell
12000-01
General Shop
Fri Aug 29 2025 20:02:58 GMT+0000 (Coordinated Universal Time)
Closed -
110: HAAS19 MILL OP1
Accepted: 0- Rej: 0
Fri Aug 29 2025 19:46:20 GMT+0000 (Coordinated Universal Time)
Alex Kreuch
30581-03
123368-002
Open -
160: INSPECT PRE-OSP INSP
Accepted: 45- Rej: 0
Fri Aug 29 2025 19:40:59 GMT+0000 (Coordinated Universal Time)
Phil So
30680-02
C414120-1084
Fri Aug 29 2025 19:40:59 GMT+0000 (Coordinated Universal Time)
Closed -
190: INSPECT INSPECT
Accepted: 297- Rej: 0
Fri Aug 29 2025 19:34:52 GMT+0000 (Coordinated Universal Time)
Phil So
30566-12
156303-005
Fri Aug 29 2025 19:34:52 GMT+0000 (Coordinated Universal Time)
Closed -
200: INSPECT INSPECT
Accepted: 321- Rej: 0
Fri Aug 29 2025 19:34:29 GMT+0000 (Coordinated Universal Time)
Phil So
29267-07
124317-011
Fri Aug 29 2025 19:34:29 GMT+0000 (Coordinated Universal Time)
Closed -
Moved to: MORI1
Accepted: 33- Rej: 0
Fri Aug 29 2025 19:32:11 GMT+0000 (Coordinated Universal Time)
Ryan Boyd
30681-09
DS4185-710-3009
Fri Aug 29 2025 19:32:11 GMT+0000 (Coordinated Universal Time)
Closed -
Moved to: MORI1
Accepted: 4- Rej: 0
Fri Aug 29 2025 19:31:59 GMT+0000 (Coordinated Universal Time)
Ryan Boyd
30683-03
DS4185-710-3061
Fri Aug 29 2025 19:31:59 GMT+0000 (Coordinated Universal Time)
Closed -
160: MORI-NLX5 LATHE OP1
Accepted: 0- Rej: 0
Fri Aug 29 2025 19:31:36 GMT+0000 (Coordinated Universal Time)
Macy Allen
30133-04
204-050-3104-001
Open -
100: ASSEMBLE ASSEMBLE
Accepted: 0- Rej: 0
Fri Aug 29 2025 19:28:58 GMT+0000 (Coordinated Universal Time)
Manuel DeSantiago
30652-23
159268-201
Open -
110: FINAL INSP FINAL INSP
Accepted: 8- Rej: 0
Fri Aug 29 2025 19:26:08 GMT+0000 (Coordinated Universal Time)
Phil So
30652-21
159508-201
Fri Aug 29 2025 19:26:08 GMT+0000 (Coordinated Universal Time)
Closed -
0: HOLDBYCUST HOLDBYCUST
Accepted: 0- Rej: 0
Fri Aug 29 2025 19:19:07 GMT+0000 (Coordinated Universal Time)
Kristy Walton
30762-01
000-901-4261-001
Fri Aug 29 2025 19:33:00 GMT+0000 (Coordinated Universal Time)
Closed -
0: New Orders New Orders
Accepted: 0- Rej: 0
Fri Aug 29 2025 19:15:16 GMT+0000 (Coordinated Universal Time)
Christine Cross
30764-01
1L500109-715
Fri Aug 29 2025 19:15:00 GMT+0000 (Coordinated Universal Time)
Closed -
140,150: HAAS16 MILL OP3
Accepted: 0- Rej: 0
Fri Aug 29 2025 19:13:54 GMT+0000 (Coordinated Universal Time)
Van Pham
30248-03
418-201-4000-421
Open -
130,140,150: HAAS24 MILL OP2
Accepted: 0- Rej: 0
Fri Aug 29 2025 19:09:45 GMT+0000 (Coordinated Universal Time)
Van Pham
30410-03
418-201-5000-412
Open -
0: PRE-PLAN PRE-PLAN
Accepted: 0- Rej: 0
Fri Aug 29 2025 19:05:56 GMT+0000 (Coordinated Universal Time)
Kristy Walton
30741-01
30208-6
Fri Aug 29 2025 19:10:00 GMT+0000 (Coordinated Universal Time)
Closed -
0: P-RELEASE P-RELEASE
Accepted: 0- Rej: 0
Fri Aug 29 2025 19:03:26 GMT+0000 (Coordinated Universal Time)
Kristy Walton
30757-01
652-061-4133-001
Fri Aug 29 2025 19:03:00 GMT+0000 (Coordinated Universal Time)
Closed -
140: INSPECT PRE-OSP INSP
Accepted: 8- Rej: 0
Fri Aug 29 2025 19:02:14 GMT+0000 (Coordinated Universal Time)
Andy Lor
30688-02
C304531-1033
Fri Aug 29 2025 19:02:14 GMT+0000 (Coordinated Universal Time)
Closed -
140: CRAFTMANSHIP DEBURR
Accepted: 0- Rej: 0
Fri Aug 29 2025 18:59:47 GMT+0000 (Coordinated Universal Time)
Christine Cross
30159-13
C193505-3467
Fri Aug 29 2025 18:59:00 GMT+0000 (Coordinated Universal Time)
Closed -
110: MAZAKLASER LASER CUT
Accepted: 123- Rej: 0
Fri Aug 29 2025 18:57:35 GMT+0000 (Coordinated Universal Time)
Bryce Devine
30705-03
418-201-2111-202
Fri Aug 29 2025 20:23:33 GMT+0000 (Coordinated Universal Time)
Closed -
0: ENGINEERING PREP ENGINEERING PREP
Accepted: 0- Rej: 0
Fri Aug 29 2025 18:57:11 GMT+0000 (Coordinated Universal Time)
Jacob Kraemer
30748-03
1454506-5
Fri Aug 29 2025 20:34:00 GMT+0000 (Coordinated Universal Time)
Closed -
Moved to: null
Accepted: 0- Rej: 0
Fri Aug 29 2025 18:55:53 GMT+0000 (Coordinated Universal Time)
Paolo Gomez
30385-06
123368-002
Fri Aug 29 2025 20:08:11 GMT+0000 (Coordinated Universal Time)
Closed -
110: MORI2 - MILL OP1
Fri Aug 29 2025 16:43:43 GMT+0000 (Coordinated Universal Time)
Accepted: 0- Rej: 0
Thijs Fortune
--
-
110: MORI2 - MILL OP1
Thu Aug 28 2025 23:10:11 GMT+0000 (Coordinated Universal Time)
Accepted: 21- Rej: 0
Jordan Grimm
Fri Aug 29 2025 07:26:02 GMT+0000 (Coordinated Universal Time)
--
-
110: MORI2 - MILL OP1
Thu Aug 28 2025 17:00:23 GMT+0000 (Coordinated Universal Time)
Accepted: 0- Rej: 0
Zack Johnson
Thu Aug 28 2025 17:30:00 GMT+0000 (Coordinated Universal Time)
--
-
110: MORI2 - MILL OP1
Thu Aug 28 2025 15:26:43 GMT+0000 (Coordinated Universal Time)
Accepted: 0- Rej: 0
Ben Lo
Thu Aug 28 2025 15:39:00 GMT+0000 (Coordinated Universal Time)
--
-
110: MORI2 - MILL OP1
Thu Aug 28 2025 14:54:03 GMT+0000 (Coordinated Universal Time)
Accepted: 0- Rej: 0
Zack Johnson
Thu Aug 28 2025 15:20:00 GMT+0000 (Coordinated Universal Time)
--
-
110,120,130,140: MORI2 - MILL OP3
Thu Aug 28 2025 13:49:52 GMT+0000 (Coordinated Universal Time)
Accepted: 0- Rej: 0
Ignacio Zavala
Thu Aug 28 2025 15:17:00 GMT+0000 (Coordinated Universal Time)
--
-
110,120: MORI2 - MILL OP2
Wed Aug 27 2025 23:08:40 GMT+0000 (Coordinated Universal Time)
Accepted: 17- Rej: 0
Sensak La
Thu Aug 28 2025 09:23:17 GMT+0000 (Coordinated Universal Time)
--
-
140,130,120,110: MORI2 - MILL OP3
Wed Aug 27 2025 19:43:10 GMT+0000 (Coordinated Universal Time)
Accepted: 1- Rej: 0
Nathan James
Wed Aug 27 2025 21:34:35 GMT+0000 (Coordinated Universal Time)
--
-
110,120,130,140: MORI2 - MILL OP3
Wed Aug 27 2025 13:58:58 GMT+0000 (Coordinated Universal Time)
Accepted: 1- Rej: 0
Ignacio Zavala
Wed Aug 27 2025 23:13:30 GMT+0000 (Coordinated Universal Time)
--
-
110: MORI2 - MILL OP1
Tue Aug 26 2025 23:54:00 GMT+0000 (Coordinated Universal Time)
Accepted: 11- Rej: 0
Sensak La
Wed Aug 27 2025 09:21:45 GMT+0000 (Coordinated Universal Time)
--
-
110: MORI2 -
Mon Aug 18 2025 16:39:52 GMT+0000 (Coordinated Universal Time)
Accepted: 27- Rej: 0
Moved to: MORI2
Charlie Vang
Mon Aug 18 2025 16:39:52 GMT+0000 (Coordinated Universal Time)
--
-
110: Tools Built - Tools Built
Fri Aug 15 2025 19:01:46 GMT+0000 (Coordinated Universal Time)
Accepted: 0- Rej: 0
Deven Huckle
Fri Aug 15 2025 19:01:46 GMT+0000 (Coordinated Universal Time)
--
-
120: Tools Built - Tools Built
Fri Aug 15 2025 19:01:46 GMT+0000 (Coordinated Universal Time)
Accepted: 0- Rej: 0
Deven Huckle
Fri Aug 15 2025 19:01:46 GMT+0000 (Coordinated Universal Time)
--
-
130: Tools Built - Tools Built
Fri Aug 15 2025 19:01:45 GMT+0000 (Coordinated Universal Time)
Accepted: 0- Rej: 0
Deven Huckle
Fri Aug 15 2025 19:01:45 GMT+0000 (Coordinated Universal Time)
--
-
130: Tool Check - Tool Check
Fri Aug 15 2025 19:01:44 GMT+0000 (Coordinated Universal Time)
Accepted: 0- Rej: 0
Deven Huckle
Fri Aug 15 2025 19:01:44 GMT+0000 (Coordinated Universal Time)
--
-
120: Tool Check - Tool Check
Fri Aug 15 2025 19:01:44 GMT+0000 (Coordinated Universal Time)
Accepted: 0- Rej: 0
Deven Huckle
Fri Aug 15 2025 19:01:44 GMT+0000 (Coordinated Universal Time)
--
-
110: Tool Check - Tool Check
Fri Aug 15 2025 19:01:43 GMT+0000 (Coordinated Universal Time)
Accepted: 0- Rej: 0
Deven Huckle
Fri Aug 15 2025 19:01:43 GMT+0000 (Coordinated Universal Time)
--
-
: MATL STAGE - None
Fri Aug 15 2025 15:14:33 GMT+0000 (Coordinated Universal Time)
Accepted: 27- Rej: 0
Moved to: MORI1
Ryan Boyd
Fri Aug 15 2025 15:14:33 GMT+0000 (Coordinated Universal Time)
--
-
: MATL STAGE -
Fri Aug 15 2025 15:12:15 GMT+0000 (Coordinated Universal Time)
Accepted: 27- Rej: 0
Moved to: MATL STAGE
Charlie Vang
Fri Aug 15 2025 15:12:15 GMT+0000 (Coordinated Universal Time)
--
-
: MATL STAGE -
Fri Aug 15 2025 15:12:15 GMT+0000 (Coordinated Universal Time)
Accepted: 27- Rej: 0
Moved to: MATL STAGE
Charlie Vang
Fri Aug 15 2025 15:12:15 GMT+0000 (Coordinated Universal Time)
--
-
0: P-RELEASE - P-RELEASE
Fri Aug 15 2025 14:42:49 GMT+0000 (Coordinated Universal Time)
Accepted: 0- Rej: 0
Moved to: MATERIAL
Randy Ho
Fri Aug 15 2025 14:50:00 GMT+0000 (Coordinated Universal Time)
--
-
0: P-RELEASE - P-RELEASE
Fri Aug 15 2025 14:42:49 GMT+0000 (Coordinated Universal Time)
Accepted: 0- Rej: 0
Randy Ho
Fri Aug 15 2025 15:27:00 GMT+0000 (Coordinated Universal Time)
--
-
0: PRE-PLAN - PRE-PLAN
Mon Jul 28 2025 19:49:57 GMT+0000 (Coordinated Universal Time)
Accepted: 0- Rej: 0
Bryan Choi
Mon Jul 28 2025 20:56:00 GMT+0000 (Coordinated Universal Time)
--
-
0: PRE-PLAN - PRE-PLAN
Mon Jul 28 2025 15:36:12 GMT+0000 (Coordinated Universal Time)
Accepted: 0- Rej: 0
Bryan Choi
Mon Jul 28 2025 16:22:00 GMT+0000 (Coordinated Universal Time)
--
-
0: PRE-PLAN - PRE-PLAN
Fri Jul 25 2025 19:00:00 GMT+0000 (Coordinated Universal Time)
Accepted: 0- Rej: 0
Bryan Choi
Fri Jul 25 2025 22:02:00 GMT+0000 (Coordinated Universal Time)
--
-
0: PRE-PLAN - PRE-PLAN
Fri Jul 25 2025 16:14:00 GMT+0000 (Coordinated Universal Time)
Accepted: 0- Rej: 0
Bryan Choi
Fri Jul 25 2025 18:00:00 GMT+0000 (Coordinated Universal Time)
--
-
0: HOLD - HOLD
Tue Jul 22 2025 15:32:39 GMT+0000 (Coordinated Universal Time)
Accepted: 0- Rej: 0
Moved to: PLAN
Christine Cross
Tue Jul 22 2025 15:32:00 GMT+0000 (Coordinated Universal Time)
--
-
0: PLAN - PLAN
Mon Jul 21 2025 17:55:20 GMT+0000 (Coordinated Universal Time)
Accepted: 0- Rej: 0
Moved to: HOLD
Ben Lo
Mon Jul 21 2025 17:55:00 GMT+0000 (Coordinated Universal Time)
--
-
0: PLAN - PLAN
Mon Jul 21 2025 17:23:41 GMT+0000 (Coordinated Universal Time)
Accepted: 0- Rej: 0
Randy Ho
Mon Jul 21 2025 17:23:00 GMT+0000 (Coordinated Universal Time)
--
-
: New Orders -
Fri Jul 18 2025 21:51:04 GMT+0000 (Coordinated Universal Time)
Accepted: 0- Rej: 0
Moved to: PLAN
AJ Moore
Fri Jul 18 2025 21:51:04 GMT+0000 (Coordinated Universal Time)
--
By selecting a zone the data you see will be filtered to show only timetickets and jobs running for that specific zone.
StepNo | Doc Type | Doc Name | Upload By | Date |
undefined | Drawing | undefined | undefined | undefined |
undefined | Bubble | undefined | undefined | undefined |
undefined | XML | undefined | undefined | undefined |
undefined | MOD3 | undefined | undefined | undefined |

null.

null.

Machine: Tool Check Material: Closed <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Hardware: NA <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Mod: Closed <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Since Planned: 0 days Since Last Moved: 0 days .

Assigned to Randy Ho, EC Date: 08/15.

Ready for Review.

Router printed.

move to material stage .

Assigned to Kyle Ducken, EC Date: 08/15.

Needs printed.

In Programming. Derek Ozzie #1. EC 8/14 Part is programmed, just finishing the fixture..

In Programming. Derek Ozzie #1. EC 8/13.

In Programming. Derek Ozzie #1. EC 8/12.

In Programming. Derek Ozzie #1. EC 8/12.

In Programming. Derek Ozzie #1. EC 8/12.

In Programming. Derek Ozzie #1. EC 8/12.

In Programming. Jordon Bell. EC 8/14.

Followed up with AJ via email 7/31 at 740am on if we need to complete the PPAP per SPX-00001489 on Customer PO.

Received spec from AJ via email 7/28 at 916am. AJ is still working with the customer on if a PPAP is required or not for us on these parts. .

Followed up with AJ via email 7/28 at 821am//Followed up with AJ via email 7/25 at 1104am on SPX SPEC and PPAP requirement /per AJ requested SPX-00044480 spec and clarifying if we need a PPAP. .

Followed up with AJ via email 7/25 at 1104am on SPX SPEC and PPAP requirement /per AJ requested SPX-00044480 spec and clarifying if we need a PPAP. .

per AJ requested SPX-00044480 spec and clarifying if we need a PPAP. .

Reached out to AJ via email 7/24 at 653am for clarification on getting spec SPX-00044480 for packaging requirements, if we need a PPAP, FN7 if we want to part mark on the machine or MSI and SN's needed, clarification on "less paint" parts are bare finish per note 3. Also advised running high risk of being late on line -01 expedite..

..

New EC: 07/24 (by Emily Marshall on 07/23/25 03:13 PM) New EC: 07/23 (by Emily Marshall on 07/23/25 08:44 AM) Assigned to Emily Marshall, EC Date: 07/22.

Spec SPX-00002623 emailed to Planning team from AJ.

Assigned to AJ Moore, EC Date: 07/21.

HOLD for material Spec SPX-00002623.

HOLD for material Spec.

Assigned to Ben Lo, EC Date: 07/21.
Part History is currently not available. Check back soon!
Clocking In & Out
Q: Do I have to enter a step number?
A: Yes, if you are clocking in or out of a job you must enter a step number.
Q: How do I know the current step number?
A: Find the work order OR enter a job number and review time tickets. It should be clear what step number is current. For Workcenters not associated with the planning, i.e. New Orders, MFG Other, etc. A triple ZERO option should populate.
Q: Can I clock into two different step numbers at the same time?
A: Yes. If you are running two different operations at the same time you can click on the "select multiple" badge and then select additional operations. There is no limit.
Q: What if I need to move a job to a workcenter not available in the drop down?
A: Submit a planning change. The work order should reflect each step needed.
Q: BUT wait... The work order has a generic workcenter(i.e. INSPECT) and I need to move the job to the CMM-HEXLG1 queue.
A: Get a manger or lead to sign off on the change. **For inspection move to planned workcenter and inspector will be prompted to enter Machine.
CNC Programming
Q: How do I clock in & out for a re-post?
Option A: Click on the purple report link when prompted. Enter job number and step number. Clock in.
Option B: Go to zones --> Re-Post. Enter job number and step number. Clock in.
Clocking Out:You can not clock out without reporting a quantity. Enter last reported quantity when alerted. To force the alert enter a quantity of 1 or greater OR click "Clock out".