Clock In and Out
Zone Part History Time Tickets Comments Files Zone Part History Time Tickets Comments Files Clock
Select Multiple
Change Options
Overwrite Quantity
Update Comments only
...
Recent Time Tickets
All Open Closed 30804-01

By selecting a zone the data you see will be filtered to show only timetickets and jobs running for that specific zone.




Attach completed CMM report with manual measurements.

StepNo Doc Type Doc Name Upload By Date
undefined Drawing undefined undefined undefined
undefined Bubble undefined undefined undefined
undefined XML undefined undefined undefined
undefined MOD3 undefined undefined undefined
undefined Other undefined undefined undefined
Image

Machine: Tool Check Material: HFM <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Hardware: NA <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Mod: Closed <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Since Planned: 0 days Since Last Moved: 0 days .

System Generated Plan Status
Thu Sep 11 2025 17:38:01 GMT+0000 (Coordinated Universal Time)
Image

In Programming. Robert reviewing.

Emily Marshall
Thu Sep 11 2025 16:44:47 GMT+0000 (Coordinated Universal Time)
Image

In Programming. Robert reviewing.

Dustin Laberta
Wed Sep 10 2025 13:43:38 GMT+0000 (Coordinated Universal Time)
Image

Working with Robert to improve plan for new material callout on remake order. Tyler pushing out date..

Dustin Laberta
Tue Sep 09 2025 16:45:03 GMT+0000 (Coordinated Universal Time)
Image

Reached out to Tyler via email 9/9 at 645am that we are going to be late to the customer. Need to issue material by 7/21/25.

Emily Marshall
Tue Sep 09 2025 13:46:13 GMT+0000 (Coordinated Universal Time)
Image

Assigned to Ben Lo, EC Date: 09/08.

Emily Marshall
Mon Sep 08 2025 15:24:21 GMT+0000 (Coordinated Universal Time)
Image

<b>Material lead time in M days:</b> 8 <b>Needed Material Dock Date:</b> 09/22/2025 <b>Material Risks: </b> Part might warp during heat treat due to thin walls. **DCP-00240 calls out a different heat treat than what is stated on the print. **AMS 2759/5 min hardness of 55HRC; DCP-00240 calls out a different material than what is on the print ** 440C IAW AMS 5880 <b>Expected Outside Processing in M days: </b>25 <b>Finishing Risks: </b>DCP-00240 has added Note 11 ** After all manufacturing and material removal steps including part marking, passivate IAW AMS 2700, Method 2; DCP-00240 has added Note 12 ** Shall create a process sample from the same material batch or lot to verify hardness IAW ASTM E18. The process sample shall proceed through all processing steps and be delivered with the final part. It is permissible to use a single process sample for multiple parts in a single lot or batch. Hardness testing shall not be conducted on the final component, only the process sample. <b>Part Complexity: </b> 7 - Complex <b>Operational Risks: </b> None.

Tyler Deis
Thu Sep 04 2025 07:00:00 GMT+0000 (Coordinated Universal Time)

Part History is currently not available. Check back soon!

Clocking In & Out

Q: Do I have to enter a step number?

A: Yes, if you are clocking in or out of a job you must enter a step number.

Q: How do I know the current step number?

A: Find the work order OR enter a job number and review time tickets. It should be clear what step number is current. For Workcenters not associated with the planning, i.e. New Orders, MFG Other, etc. A triple ZERO option should populate.

Q: Can I clock into two different step numbers at the same time?

A: Yes. If you are running two different operations at the same time you can click on the "select multiple" badge and then select additional operations. There is no limit.

Q: What if I need to move a job to a workcenter not available in the drop down?

A: Submit a planning change. The work order should reflect each step needed.

Q: BUT wait... The work order has a generic workcenter(i.e. INSPECT) and I need to move the job to the CMM-HEXLG1 queue.

A: Get a manger or lead to sign off on the change. **For inspection move to planned workcenter and inspector will be prompted to enter Machine.

CNC Programming

Q: How do I clock in & out for a re-post?

Option A: Click on the purple report link when prompted. Enter job number and step number. Clock in.
Option B: Go to zones --> Re-Post. Enter job number and step number. Clock in.

Clocking Out:You can not clock out without reporting a quantity. Enter last reported quantity when alerted. To force the alert enter a quantity of 1 or greater OR click "Clock out".