Attach completed CMM report with manual measurements.

StepNo Doc Type Doc Name Upload By Date
undefined Drawing undefined undefined undefined
undefined Bubble undefined undefined undefined
undefined XML undefined undefined undefined
undefined MOD3 undefined undefined undefined
Image

re-inspect with modified fixture.

Phil So
Thu Oct 09 2025 17:01:41 GMT+0000 (Coordinated Universal Time)
Image

Fixture Mod completed 10/7..

Ryan Boyd
Wed Oct 08 2025 16:42:31 GMT+0000 (Coordinated Universal Time)
Image

Setting up in H23 today. EC 10/7. .

Ryan Boyd
Tue Oct 07 2025 14:07:10 GMT+0000 (Coordinated Universal Time)
Image

Unable to locate 3 station Rock Lock Bases needed for setup. New EC 10/7..

Ryan Boyd
Fri Oct 03 2025 14:42:55 GMT+0000 (Coordinated Universal Time)
Image

Fixture patch to S/U in H25 EC 10/2..

Ryan Boyd
Thu Oct 02 2025 20:59:34 GMT+0000 (Coordinated Universal Time)
Image

Having trouble finding a window to "Sneak" into a UMC1250. .

Ryan Boyd
Mon Sep 29 2025 16:07:21 GMT+0000 (Coordinated Universal Time)
Image

Assigned to Ryan Boyd, EC Date: 09/25.

Alex Limtiaco
Thu Sep 25 2025 15:04:25 GMT+0000 (Coordinated Universal Time)
Image

Fixture and setup sheet with Ryan B to sneak onto a machine.

Alex Limtiaco
Thu Sep 25 2025 15:04:14 GMT+0000 (Coordinated Universal Time)
Image

Patch program complete, working with Ryan to machine availability .

Alex Limtiaco
Wed Sep 24 2025 23:34:29 GMT+0000 (Coordinated Universal Time)
Image

New EC: 09/24 (by Alex Limtiaco on 09/24/25 10:54 AM) Assigned to Patrick Inglis, EC Date: 09/26.

Alex Limtiaco
Wed Sep 24 2025 17:52:44 GMT+0000 (Coordinated Universal Time)
Image

Will need to modify fixture to accept .201 pins. Also need to make .201 pins.

Alex Limtiaco
Wed Sep 24 2025 17:43:32 GMT+0000 (Coordinated Universal Time)
Image

per AJ - Met on it in MRB today and this this was incorrectly sent to you for REMAKE. Possible the team will need a new work order to check them in a fixture, but likely will not need remade.

Emily Marshall
Tue Sep 23 2025 16:32:04 GMT+0000 (Coordinated Universal Time)
Image

Machine: Program Material: HFM <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Hardware: NA <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Mod: Closed <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Since Planned: 0 days Since Last Moved: 0 days .

System Generated Plan Status
Tue Sep 23 2025 16:29:19 GMT+0000 (Coordinated Universal Time)
Image

per AJ - No we will not be able to push the date.  Customer needs these 9/30 and has voiced that repeatedly.  I am really not on board with the root cause stated on this NCR. We will be doing an FMEA or something similar to avoid the continual remakes on these? .

Emily Marshall
Tue Sep 23 2025 16:04:51 GMT+0000 (Coordinated Universal Time)
Image

Reached out to AJ via email 9/23 at 5:08am to see about getting date relief on remake quantity.

Emily Marshall
Tue Sep 23 2025 13:41:24 GMT+0000 (Coordinated Universal Time)
Image

Material sized PO 66206 AND 34974 Material 6061-T6 .032 THK BARE Job number 30045-07 ( 168 PCS TOTAL), Sheet size 48 X 144 (PO: 66206, 5 SHEETS, 160 PCS) 48 X 36 (PO 34974, 1 SHEET, 8 PCS) Remaining rem NONE Location 3-J.

Randy Ho
Tue Sep 23 2025 12:41:02 GMT+0000 (Coordinated Universal Time)
Image

Randy sizing material.

Dustin Laberta
Tue Sep 23 2025 12:09:36 GMT+0000 (Coordinated Universal Time)

Part History is currently not available. Check back soon!

Clocking In & Out

Q: Do I have to enter a step number?

A: Yes, if you are clocking in or out of a job you must enter a step number.

Q: How do I know the current step number?

A: Find the work order OR enter a job number and review time tickets. It should be clear what step number is current. For Workcenters not associated with the planning, i.e. New Orders, MFG Other, etc. A triple ZERO option should populate.

Q: Can I clock into two different step numbers at the same time?

A: Yes. If you are running two different operations at the same time you can click on the "select multiple" badge and then select additional operations. There is no limit.

Q: What if I need to move a job to a workcenter not available in the drop down?

A: Submit a planning change. The work order should reflect each step needed.

Q: BUT wait... The work order has a generic workcenter(i.e. INSPECT) and I need to move the job to the CMM-HEXLG1 queue.

A: Get a manger or lead to sign off on the change. **For inspection move to planned workcenter and inspector will be prompted to enter Machine.

CNC Programming

Q: How do I clock in & out for a re-post?

Option A: Click on the purple report link when prompted. Enter job number and step number. Clock in.
Option B: Go to zones --> Re-Post. Enter job number and step number. Clock in.

Clocking Out:You can not clock out without reporting a quantity. Enter last reported quantity when alerted. To force the alert enter a quantity of 1 or greater OR click "Clock out".