Clock In and Out
Zone Part History Time Tickets Comments Files Zone Part History Time Tickets Comments Files Clock
Select Multiple
Change Options
Overwrite Quantity
Update Comments only
...
Recent Time Tickets
All Open Closed 30727-01

By selecting a zone the data you see will be filtered to show only timetickets and jobs running for that specific zone.




Attach completed CMM report with manual measurements.

StepNo Doc Type Doc Name Upload By Date
undefined Drawing undefined undefined undefined
undefined Bubble undefined undefined undefined
undefined XML undefined undefined undefined
undefined MOD3 undefined undefined undefined
undefined Other undefined undefined undefined
Image

UPS Tracking: 1Z2326X60365813060 .

Charlie Vang
Thu Oct 23 2025 17:04:24 GMT+0000 (Coordinated Universal Time)
Image

Machine: Not Required <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Material: HFM <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Hardware: NA <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Mod: Closed <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Since Planned: 0 days Since Last Moved: 0 days .

System Generated Plan Status
Tue Oct 14 2025 16:34:50 GMT+0000 (Coordinated Universal Time)
Image

Dims verified. .

Zack Johnson
Tue Oct 14 2025 16:34:50 GMT+0000 (Coordinated Universal Time)
Image

Assigned to Tim Patrick, EC Date: 10/14.

Dustin Laberta
Tue Oct 14 2025 14:02:05 GMT+0000 (Coordinated Universal Time)
Image

Working with suppliers on material thickness. Making sure the material is in tolerance before purchasing. .

Yia Lee
Fri Oct 10 2025 21:04:05 GMT+0000 (Coordinated Universal Time)
Image

Waiting on Material Purchase.

Emily Marshall
Fri Oct 10 2025 18:13:26 GMT+0000 (Coordinated Universal Time)
Image

Material size request from customer: .020 x 12" x 12" Qty 6 .

Tyler Deis
Thu Oct 09 2025 16:47:14 GMT+0000 (Coordinated Universal Time)
Image

Derek to outsource to Progress tool and die INDY. .

Tyler Deis
Thu Oct 09 2025 16:46:22 GMT+0000 (Coordinated Universal Time)
Image

Progress Tool & Die INDY submitted a competitive quote. .

Tyler Deis
Tue Oct 07 2025 16:38:34 GMT+0000 (Coordinated Universal Time)
Image

Created second line (30272-02) for testing the dimple feature..

Tyler Deis
Tue Sep 23 2025 16:45:53 GMT+0000 (Coordinated Universal Time)
Image

Unable to cancel PO without ruining business relationship. test samples of dimple to perform by 9/19.

Tyler Deis
Fri Sep 12 2025 21:10:02 GMT+0000 (Coordinated Universal Time)
Image

Assigned to Tyler Deis, EC Date: 09/15.

Phil So
Thu Sep 11 2025 17:37:05 GMT+0000 (Coordinated Universal Time)
Image

FMEA meeting concluded with Tyler looking to see if we can cancel PO due to improper quoting and not realizing this part had to be hot forged. risk of cracking the "dimples" during forming. .

Tyler Deis
Thu Sep 11 2025 17:28:00 GMT+0000 (Coordinated Universal Time)
Image

FMEA 9/4 was held. Tyler looking into material thickness tolerance from vendor. Tyler looking into outsource complete vendors. Next FMEA follow-up scheduled for 9/10 at 12:30pm.

Dustin Laberta
Fri Sep 05 2025 15:08:42 GMT+0000 (Coordinated Universal Time)
Image

Phil scheduled an FMEA meeting 9/4 at 1230pm.

Emily Marshall
Wed Sep 03 2025 18:08:31 GMT+0000 (Coordinated Universal Time)
Image

New EC: 09/10 (by Phil So on 09/09/25 10:39 AM) Assigned to Phil So, EC Date: 09/03.

Tyler Deis
Tue Sep 02 2025 16:52:43 GMT+0000 (Coordinated Universal Time)
Image

FMEA to be set up to discuss risks in Manufactuing .

Tyler Deis
Thu Aug 28 2025 21:10:40 GMT+0000 (Coordinated Universal Time)
Image

Email conversations to make in house..

Tyler Deis
Thu Aug 28 2025 21:09:21 GMT+0000 (Coordinated Universal Time)
Image

New EC: 10/08 (by Tyler Deis on 10/07/25 10:04 AM) New EC: 09/30 (by Tyler Deis on 09/23/25 09:45 AM) New EC: 09/18 (by Tyler Deis on 09/16/25 10:20 AM) New EC: 08/29 (by Tyler Deis on 08/26/25 09:59 AM) Assigned to Tyler Deis, EC Date: 08/22.

Emily Marshall
Thu Aug 21 2025 15:26:28 GMT+0000 (Coordinated Universal Time)
Image

Reached out to Tyler via email 8/21 at 814am requesting customer model. thoughts on how to make the part. risks needed for 8complex part. If risks are 28 or over needs to work with Phil to get a FMEA set up per 7001F..

Emily Marshall
Thu Aug 21 2025 15:26:14 GMT+0000 (Coordinated Universal Time)
Image

Assigned to Ben Lo, EC Date: 08/21.

Emily Marshall
Thu Aug 21 2025 12:29:43 GMT+0000 (Coordinated Universal Time)
Image

Working w/ Tim for MFG plan..

Ben Lo
Wed Aug 20 2025 19:49:42 GMT+0000 (Coordinated Universal Time)
Image

Moving forward without model. Customer unable to provide. .

Tyler Deis
Wed Aug 20 2025 18:32:12 GMT+0000 (Coordinated Universal Time)
Image

Buyer out on PTO, pinged 3 others for model. .

Tyler Deis
Tue Aug 19 2025 16:50:54 GMT+0000 (Coordinated Universal Time)
Image

<b>Material lead time in M days:</b> 10 <b>Needed Material Dock Date:</b> 09/01/2025 <b>Material Risks: </b> Titanium sheet does not like to bend and retain attempted formed shape <b>Expected Outside Processing in M days: </b>15 <b>Finishing Risks: </b>None <b>Part Complexity: </b> 8 - Very Complex <b>Operational Risks: </b> Timeline is tight and needs a lot of tooling designed and built. This part has potential to be a production run..

Tyler Deis
Wed Aug 13 2025 07:00:00 GMT+0000 (Coordinated Universal Time)
Image

Missing model, requested.

Tyler Deis
Tue Aug 12 2025 23:46:23 GMT+0000 (Coordinated Universal Time)
Image

New EC: 08/20 (by Tyler Deis on 08/19/25 09:50 AM) New EC: 08/18 (by Tyler Deis on 08/15/25 10:42 AM) Assigned to Tyler Deis, EC Date: 08/14.

Tyler Deis
Tue Aug 12 2025 17:07:50 GMT+0000 (Coordinated Universal Time)

Part History is currently not available. Check back soon!

Clocking In & Out

Q: Do I have to enter a step number?

A: Yes, if you are clocking in or out of a job you must enter a step number.

Q: How do I know the current step number?

A: Find the work order OR enter a job number and review time tickets. It should be clear what step number is current. For Workcenters not associated with the planning, i.e. New Orders, MFG Other, etc. A triple ZERO option should populate.

Q: Can I clock into two different step numbers at the same time?

A: Yes. If you are running two different operations at the same time you can click on the "select multiple" badge and then select additional operations. There is no limit.

Q: What if I need to move a job to a workcenter not available in the drop down?

A: Submit a planning change. The work order should reflect each step needed.

Q: BUT wait... The work order has a generic workcenter(i.e. INSPECT) and I need to move the job to the CMM-HEXLG1 queue.

A: Get a manger or lead to sign off on the change. **For inspection move to planned workcenter and inspector will be prompted to enter Machine.

CNC Programming

Q: How do I clock in & out for a re-post?

Option A: Click on the purple report link when prompted. Enter job number and step number. Clock in.
Option B: Go to zones --> Re-Post. Enter job number and step number. Clock in.

Clocking Out:You can not clock out without reporting a quantity. Enter last reported quantity when alerted. To force the alert enter a quantity of 1 or greater OR click "Clock out".