Clock In and Out
Zone Part History Time Tickets Comments Files Zone Part History Time Tickets Comments Files Clock
Select Multiple
Change Options
Overwrite Quantity
Update Comments only
...
Recent Time Tickets
All Open Closed 30820-01

By selecting a zone the data you see will be filtered to show only timetickets and jobs running for that specific zone.




Attach completed CMM report with manual measurements.

StepNo Doc Type Doc Name Upload By Date
undefined Drawing undefined undefined undefined
undefined Parts List undefined undefined undefined
undefined Bubble undefined undefined undefined
undefined XML undefined undefined undefined
undefined MOD3 undefined undefined undefined
Image

2hr Setup/48min run time.

Emily Marshall
Mon Oct 20 2025 12:40:11 GMT+0000 (Coordinated Universal Time)
Image

32 parts in Amada Queue Rack I part Lost.

Seng Lor
Wed Oct 15 2025 17:10:33 GMT+0000 (Coordinated Universal Time)
Image

Assigned to Paolo Gomez, EC Date: 10/15.

Emily Marshall
Wed Oct 15 2025 16:09:51 GMT+0000 (Coordinated Universal Time)
Image

null.

Ryan Erickson
Wed Oct 08 2025 22:11:21 GMT+0000 (Coordinated Universal Time)
Image

Assigned to , EC Date: 10/08.

Emily Marshall
Wed Oct 08 2025 16:24:56 GMT+0000 (Coordinated Universal Time)
Image

Assigned to Paolo Gomez, EC Date: 10/08.

Emily Marshall
Wed Oct 08 2025 15:26:04 GMT+0000 (Coordinated Universal Time)
Image

Qty 33. 3 min apart.

Paolo Gomez
Mon Oct 06 2025 17:53:11 GMT+0000 (Coordinated Universal Time)
Image

null.

Bryce Devine
Mon Oct 06 2025 17:05:19 GMT+0000 (Coordinated Universal Time)
Image

FINN POWER REMOVED/MAINTENANCE JIM INSTALLING LIGHTS NEAR LASER. DAN AND BRYCE HELPING MOVE ITEMS AROUND AS NEEDED.

Emily Marshall
Wed Oct 01 2025 20:00:04 GMT+0000 (Coordinated Universal Time)
Image

Machine: Ready <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Material: Closed <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Hardware: NA <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Mod: Closed <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Since Planned: 0 days Since Last Moved: 0 days .

System Generated Plan Status
Wed Sep 17 2025 19:32:33 GMT+0000 (Coordinated Universal Time)
Image

Assigned to Randy Ho, EC Date: 09/17.

Emily Marshall
Wed Sep 17 2025 17:08:02 GMT+0000 (Coordinated Universal Time)
Image

Ready for Review.

Kyle Ducken
Wed Sep 17 2025 16:46:50 GMT+0000 (Coordinated Universal Time)
Image

Assigned to Kyle Ducken, EC Date: 09/17.

Emily Marshall
Wed Sep 17 2025 12:05:33 GMT+0000 (Coordinated Universal Time)
Image

Needs printed.

Emily Marshall
Wed Sep 17 2025 12:02:46 GMT+0000 (Coordinated Universal Time)
Image

Material sized PO 63169 Material 17-7 PH .125 THK AMS 5528 Job number 30820-01 (20 PCS), Sheet size 36 X 54 Remaining rem 36 X 30 Location 4-B.

Randy Ho
Tue Sep 16 2025 14:57:14 GMT+0000 (Coordinated Universal Time)
Image

Randy sizing material.

Dustin Laberta
Mon Sep 15 2025 17:36:52 GMT+0000 (Coordinated Universal Time)
Image

SFS (qty 8) and parts on rack in Shipping.

Christine Cross
Thu Sep 11 2025 20:15:48 GMT+0000 (Coordinated Universal Time)
Image

Assigned to Emily Marshall, EC Date: 09/11.

Emily Marshall
Thu Sep 11 2025 14:17:23 GMT+0000 (Coordinated Universal Time)
Image

Assigned to Ben Lo, EC Date: 09/11.

Emily Marshall
Thu Sep 11 2025 14:15:16 GMT+0000 (Coordinated Universal Time)
Image

Partial SFS (qty 8) - WIP.

Christine Cross
Wed Sep 10 2025 21:45:28 GMT+0000 (Coordinated Universal Time)
Image

<b>Material lead time in M days:</b> 12 <b>Needed Material Dock Date:</b> 10/02/2025 <b>Material Risks: </b> None <b>Expected Outside Processing in M days: </b>8 <b>Finishing Risks: </b>None <b>Part Complexity: </b> 3 - Slightly Complex <b>Operational Risks: </b> None.

Davis Tucker
Wed Sep 10 2025 07:00:00 GMT+0000 (Coordinated Universal Time)

Part History is currently not available. Check back soon!

Clocking In & Out

Q: Do I have to enter a step number?

A: Yes, if you are clocking in or out of a job you must enter a step number.

Q: How do I know the current step number?

A: Find the work order OR enter a job number and review time tickets. It should be clear what step number is current. For Workcenters not associated with the planning, i.e. New Orders, MFG Other, etc. A triple ZERO option should populate.

Q: Can I clock into two different step numbers at the same time?

A: Yes. If you are running two different operations at the same time you can click on the "select multiple" badge and then select additional operations. There is no limit.

Q: What if I need to move a job to a workcenter not available in the drop down?

A: Submit a planning change. The work order should reflect each step needed.

Q: BUT wait... The work order has a generic workcenter(i.e. INSPECT) and I need to move the job to the CMM-HEXLG1 queue.

A: Get a manger or lead to sign off on the change. **For inspection move to planned workcenter and inspector will be prompted to enter Machine.

CNC Programming

Q: How do I clock in & out for a re-post?

Option A: Click on the purple report link when prompted. Enter job number and step number. Clock in.
Option B: Go to zones --> Re-Post. Enter job number and step number. Clock in.

Clocking Out:You can not clock out without reporting a quantity. Enter last reported quantity when alerted. To force the alert enter a quantity of 1 or greater OR click "Clock out".