Attach completed CMM report with manual measurements.

StepNo Doc Type Doc Name Upload By Date
No Documents uploaded
Image

After FMEA meeting Phil reached out to Dave with open questions about making the assembly. 1.our internal dwgs and mods reviewed by customer and approved -NOT NECESSARY. 2. pulley system removed - PULLY SYSTEM NOT NEEDED FOR PROOF LOAD TEST. 3. responsible for proof load testing - JEMCO TO PERFORM PROOF LOAD TEST 3. shipping crate - SHIPPING CRATE DESIGNED AND PROVIDED BE JEMCO 4. updated finishing (will need clarification) GENERAL AUTOMOTIVE PRIMER AND PAINT (RATTLE CAN) and cleaning (will need cleaning spec) ALKALINE CLEAN WILL REQUEST SPEC Will need a follow up meeting scheduled by Dave once we have received clarification..

Dave Barr
Fri Sep 05 2025 23:47:58 GMT+0000 (Coordinated Universal Time)
Image

After FMEA meeting Phil reached out to Dave with open questions about making the assembly. 1.our internal dwgs and mods reviewed by customer and approved. 2. pulley system removed. 3. responsible for proof load testing 3. shipping crate. 4. updated finishing (will need clarification) and cleaning (will need cleaning spec)Will need a follow up meeting scheduled by Dave once we have received clarification. Email sent 8/13 at 1254pm.

Emily Marshall
Thu Aug 14 2025 13:51:29 GMT+0000 (Coordinated Universal Time)
Image

Assigned to Dave Barr, EC Date: 08/13.

AJ Moore
Tue Aug 12 2025 17:03:54 GMT+0000 (Coordinated Universal Time)
Image

FMEA rescheduled for 8/12 at 1230pm.

Emily Marshall
Thu Aug 07 2025 21:06:44 GMT+0000 (Coordinated Universal Time)
Image

Assigned to , EC Date: 08/07.

Emily Marshall
Thu Aug 07 2025 21:05:37 GMT+0000 (Coordinated Universal Time)
Image

Assigned to Emily Marshall, EC Date: 08/05.

Dave Barr
Tue Aug 05 2025 17:06:18 GMT+0000 (Coordinated Universal Time)
Image

Machine: MFG Plan Material: NA <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Hardware: NA <i class="fa-sharp fa-solid fa-shield-check text-success"></i> Mod: Pending Since Planned: 0 days Since Last Moved: 0 days .

System Generated Plan Status
Thu Jul 31 2025 16:53:06 GMT+0000 (Coordinated Universal Time)
Image

Reached out to Dave via email 7/31 952am seeing if FMEA meeting was held. Meeting needs to be completed prior to planning.

Emily Marshall
Thu Jul 31 2025 16:53:05 GMT+0000 (Coordinated Universal Time)
Image

New EC: 11/05 (by Gregg Marshall on 10/16/25 09:51 AM) New EC: 10/23 (by Gregg Marshall on 10/16/25 09:49 AM) New EC: 10/14 (by Gregg Marshall on 10/07/25 09:59 AM) New EC: 10/02 (by Dave Barr on 09/25/25 10:04 AM) New EC: 09/23 (by Dave Barr on 09/16/25 09:55 AM) New EC: 09/11 (by Dave Barr on 09/04/25 10:01 AM) New EC: 09/02 (by Dave Barr on 08/26/25 10:01 AM) New EC: 08/21 (by Dave Barr on 08/21/25 10:01 AM) New EC: 08/20 (by Emily Marshall on 08/20/25 05:05 AM) New EC: 08/21 (by Dave Barr on 08/19/25 10:33 AM) New EC: 08/18 (by Dave Barr on 08/14/25 09:43 AM) New EC: 07/29 (by Dave Barr on 07/22/25 10:04 AM) Assigned to Dave Barr, EC Date: 07/17.

Dave Barr
Thu Jul 10 2025 17:10:14 GMT+0000 (Coordinated Universal Time)
Image

Moved to hold until FMEA meeting is held. Dave scheduled meeting for Tuesday 7/15 at 1pm. Once meeting is held and we have a plan of attack on how to reapproach job will move back into planning..

Emily Marshall
Thu Jul 10 2025 15:59:08 GMT+0000 (Coordinated Universal Time)
Image

PO revision corrected - TD127699_1_REDLINE 5_05_2025 Delivery TBD - quoted lead-time 20 weeks.

Dave Barr
Thu Jul 10 2025 14:47:10 GMT+0000 (Coordinated Universal Time)
Image

PO revision corrected - TD127699_1_REDLINE 5_05_2025 Delivery TBD - quoted lead-time 20 weeks.

Dave Barr
Thu Jul 10 2025 07:47:00 GMT+0000 (Coordinated Universal Time)
Image

Pinger buyer to get correct revision on PO -.

Dave Barr
Mon Jun 16 2025 09:23:00 GMT+0000 (Coordinated Universal Time)
Image

Working with engineer to clarify materials - drawing has discrepancy between material grades and specs.

Dave Barr
Mon Mar 17 2025 11:22:00 GMT+0000 (Coordinated Universal Time)
Image

Working with engineer to clarify materials - drawing has discrepancy between material grades and specs.

Dave Barr
Fri Feb 21 2025 07:21:00 GMT+0000 (Coordinated Universal Time)
Image

New EC: 07/14 (by Dave Barr on 07/07/25 10:34 AM) New EC: 07/03 (by Dave Barr on 06/26/25 10:31 AM) New EC: 06/24 (by Dave Barr on 06/16/25 09:24 AM) New EC: 06/18 (by Dave Barr on 06/09/25 10:14 AM) New EC: 06/06 (by Dave Barr on 05/30/25 10:05 AM) New EC: 05/21 (by Dave Barr on 05/16/25 10:04 AM) New EC: 05/14 (by Dave Barr on 05/01/25 10:18 AM) New EC: 04/23 (by Dave Barr on 04/09/25 10:13 AM) New EC: 04/07 (by Dave Barr on 03/24/25 10:22 AM) New EC: 03/24 (by Dave Barr on 03/17/25 11:22 AM) New EC: 03/17 (by Dave Barr on 03/10/25 08:20 AM) New EC: 03/07 (by Dave Barr on 02/28/25 10:50 AM) New EC: 02/27 (by Dave Barr on 02/25/25 08:31 AM) New EC: 02/25 (by Dave Barr on 01/29/25 10:30 AM) Assigned to Dave Barr, EC Date: 01/28.

Dave Barr
Tue Dec 31 2024 20:27:04 GMT+0000 (Coordinated Universal Time)
Image

Just following up on this clarification. Can your team evaluate our requested material substitutions using the revision ‘0’ REDLINE drawing? Once we have that we can proceed with fabrication..

Dave Barr
Tue Dec 31 2024 12:21:00 GMT+0000 (Coordinated Universal Time)
Image

Pinged again for clarification from customer 11/8 - Materials and specifications are incorrect on drawing -.

Dave Barr
Fri Nov 15 2024 21:58:39 GMT+0000 (Coordinated Universal Time)
Image

New EC: 12/16 (by Dave Barr on 12/09/24 08:42 AM) New EC: 12/04 (by Dave Barr on 11/27/24 02:02 PM) New EC: 11/26 (by Dave Barr on 11/05/24 10:50 AM) New EC: 10/25 (by Dave Barr on 09/30/24 11:14 AM) New EC: 09/25 (by Dave Barr on 09/18/24 10:57 AM) New EC: 09/19 (by Dave Barr on 08/15/24 05:56 PM) Assigned to Dave Barr, EC Date: 07/26.

Tim Patrick
Tue Jul 23 2024 19:58:45 GMT+0000 (Coordinated Universal Time)
Image

Models/Dwgs Complete, HF customer clarification on trolley.

Ben Lo
Tue Jul 23 2024 19:46:06 GMT+0000 (Coordinated Universal Time)
Image

Complete, HF customer clarification on trolley.

Zack Johnson
Wed Jul 17 2024 19:51:49 GMT+0000 (Coordinated Universal Time)
Image

New EC: 08/07 (by Dave Barr on 07/23/24 06:21 PM) Assigned to , EC Date: 07/17.

Zack Johnson
Wed Jul 17 2024 19:45:33 GMT+0000 (Coordinated Universal Time)
Image

Models and drawings complete, working on testing procedure and tools needed. .

Zack Johnson
Fri Jul 12 2024 01:34:17 GMT+0000 (Coordinated Universal Time)
Image

Weight & fixture models complete, drawings in process. .

Zack Johnson
Thu Jul 11 2024 00:55:35 GMT+0000 (Coordinated Universal Time)
Image

Weight & fixture design in process. .

Zack Johnson
Wed Jul 10 2024 01:45:17 GMT+0000 (Coordinated Universal Time)
Image

New EC: 07/18 (by Zack Johnson on 07/17/24 01:43 AM) New EC: 07/17 (by Zack Johnson on 07/16/24 01:53 AM) New EC: 07/16 (by Zack Johnson on 07/12/24 01:30 AM) New EC: 07/12 (by Zack Johnson on 07/10/24 01:45 AM) New EC: 07/10 (by Zack Johnson on 07/10/24 01:45 AM) Assigned to Zack Johnson, EC Date: 07/12.

Zack Johnson
Wed Jul 10 2024 01:44:22 GMT+0000 (Coordinated Universal Time)
Image

TEST WEIGHT FOR ASSEMBLY PROOF TEST.

Emily Marshall
Mon Jul 08 2024 20:16:23 GMT+0000 (Coordinated Universal Time)
Image

New BOM added from part history.

Emily Marshall
Mon Jul 08 2024 16:29:19 GMT+0000 (Coordinated Universal Time)
Image

Due Date Changed to 07/01/24 from 07/08/24.

System Generated
Mon Jul 08 2024 16:29:19 GMT+0000 (Coordinated Universal Time)

Part History is currently not available. Check back soon!

Clocking In & Out

Q: Do I have to enter a step number?

A: Yes, if you are clocking in or out of a job you must enter a step number.

Q: How do I know the current step number?

A: Find the work order OR enter a job number and review time tickets. It should be clear what step number is current. For Workcenters not associated with the planning, i.e. New Orders, MFG Other, etc. A triple ZERO option should populate.

Q: Can I clock into two different step numbers at the same time?

A: Yes. If you are running two different operations at the same time you can click on the "select multiple" badge and then select additional operations. There is no limit.

Q: What if I need to move a job to a workcenter not available in the drop down?

A: Submit a planning change. The work order should reflect each step needed.

Q: BUT wait... The work order has a generic workcenter(i.e. INSPECT) and I need to move the job to the CMM-HEXLG1 queue.

A: Get a manger or lead to sign off on the change. **For inspection move to planned workcenter and inspector will be prompted to enter Machine.

CNC Programming

Q: How do I clock in & out for a re-post?

Option A: Click on the purple report link when prompted. Enter job number and step number. Clock in.
Option B: Go to zones --> Re-Post. Enter job number and step number. Clock in.

Clocking Out:You can not clock out without reporting a quantity. Enter last reported quantity when alerted. To force the alert enter a quantity of 1 or greater OR click "Clock out".